Project tank definition

Project tank means one or more tanks that would be upgraded, replaced, or removed with loan or grant funds. “Project tank” also includes one or more tanks that are upgraded to comply with the Enhanced Vapor Recovery Phase II regulations.
Project tank means the tank that is the subject of the project.

Examples of Project tank in a sentence

  • This report has two objectives: • Present a methodology for selecting a preferred strategy for West Valley Demonstration Project tank lay-up.

  • Under the Project, tank system modernization by restoring and repairing water bodies and improving canal irrigation system through repair and rehabilitation are proposed to be taken up in three phases.

Related to Project tank

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Bulk gasoline plant means a gasoline storage and distribution facility with an average daily throughput of 20,000 gallons (76,000 liters) of gasoline or less on a 30-day rolling average.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Manufacturing Facilities means facilities engaged in the mechanical or chemical transformation of materials or substances into new products and shall include:

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Development Phase means the period before a vehicle type is type approved.

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Bulk plant means a motor fuel storage and distribution facility that is not a terminal and from

  • Project area budget means a multiyear projection of annual or cumulative

  • Manufacturing Facility means buildings and structures, including machinery and equipment, the primary purpose of which is or will be the manufacture of tangible goods or materials or the processing of such goods or materials by physical or chemical change.

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.

  • Development Project means a project for the development of land within a

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Project Land means any parcel or parcels of land on which the project is developed and constructed by a promoter;

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Improvement completion assurance means a surety bond, letter of credit,