Project Setting definition

Project Setting. > “Period” For CoDeSys: see “webvisu.htm” > “UPDATETIME” The MicroBrowser supports visualizations designed with CoDeSys 2.x. The following elements are NOT supported: • Font styles underline and strikethrough • Frame style other than solid • Tooltip-display • Keyboard shortcuts • Run external program • Watchlists / Receipts The following variables can be defined in CoDeSys 2 to enable specific functions on the panel. They all begin with the prefix "SPC_MB_". These variables must appear in a view in any way. For example in a rectangle element in the textdisplay-variable field. This element can be hidden. The best way is to insert these elements in the start view, mostly PLC_VISU. A demo project showing the use of these variables is available at ▇▇▇▇://▇▇▇▇▇▇.▇▇/public/MicroBrowser/Amena/index.html.
Project Setting. > “Period” For CoDeSys: see “webvisu.htm” > “UPDATETIME” Unsupported Features‌‌‌ The MicroBrowser supports visualizations designed with CoDeSys 2.x. The following elements are NOT supported: • Font styles underline and strikethrough • Frame style other than solid • Tooltip-display • Keyboard shortcuts • Run external program • Watchlists / Receipts‌ There is a possibility to configure a button to go back to the setup page. To do so, configure a button with the intern command: “INTERN EXITPROGRAM” (in the tab “input->Execute program”).‌ The following variables can be defined in CoDeSys 2 to enable specific functions on the panel. They all begin with the prefix "SPC_MB_". These variables must appear in a view in any way. For example in a rectangle element in the textdisplay-variable field. This element can be hidden. The best way is to insert these elements in the start view, mostly PLC_VISU. A demo project showing the use of these variables is available at ▇▇▇▇://▇▇▇▇▇▇.▇▇/public/MicroBrowser/Amena/index.html. Variable: SPC_MB_Backlight‌ With the variable "SPC_MB_Backlight", it is possible to control the backlight of the embedded device. CoDeSys definition: SPC_MB_Backlight:BOOL; Variable value: • 0: the device behaves as normal, i.e. it switches the backlight off after a given timeout. • 1: the backlight stays permanently on.‌ The panel doesn't have an internal clock. By defining the variable "SPC_MB_Clock", it is possible to set the time and date of the panel. This can be used for trend elements. CoDeSys definition: SPC_MB_Clock:DT; Variable value: CoDeSys definition: SPC_MB_GreenLed:BOOL;‌ Variable value: • 0: disable the green led • 1: enable the green led‌ With the variable "SPC_MB_RedLed", it is possible to control the red status led of the embedded device. CoDeSys definition: SPC_MB_RedLed:BOOL; Variable value: • 0: disable the red led • 1: enable the red led‌ The following variables can be set in CoDeSys 3 to enable specific functions on the panel. You need to write a special command in a text field on webvisu. It is possible to use e.g. white text on white background to hide this message. You need to display following string @@”Variable-Name”=”Variable- Value” where Variable-Name is the name of variable and Variable-Value is value of variable. Variable: @MB_LPC_Backlight‌ With the variable "@MB_LPC_Backlight", it is possible to control the backlight of the embedded device. Example display text in CoDeSys 3: @@”@MB_LPC_Backlight”=”1” Variable value: • 0: the de...

Examples of Project Setting in a sentence

  • Voltage Describe the voltage, components, lines and stations Project Setting Urban/rural Role(s) on Project Role, duties and responsibilities Other Information Any information the Recipient considers relevant to the Evaluation Criteria SCHEDULE "B" EVALUATION CRITERIA‌ Each Submission will be evaluated by applying the below criteria: Pre-Submission Documents and Declaration of Commitment 1.

  • Project: Setting up of 861 telecom towers for cell sites for various telecom operators in India.

Related to Project Setting

  • Project Services means architectural, engineering services, land surveying, construction management at-risk services, ancillary technical services or other construction-related services determined by the board to be required by the project.

  • Project Start Date means the first Milestone Start Date specified in Schedule B;

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Reference Interconnection Offer or “RIO” means a document published by a service provider specifying terms and conditions on which the other service provider may seek interconnection with such service provider;

  • China Connect Service means the order-routing service through which Northbound orders placed by an Exchange Participant may be transmitted by an SEHK Subsidiary to the corresponding China Connect Market for the buying and selling of China Connect Securities and any related supporting services.