Project line definition

Project line means the evacuation infrastructure from the generating station to the interconnecting sub-station of the licensee, to be provided, operated and maintained as a part of the project by the renewable energy generator(s) for the purpose of evacuation of power from the project;
Project line means kV …………circuit electrical line from the Station to sub station of the HPSEBL at to be constructed, operated and maintained, as a part of the Project by the Company for the purpose of evacuation of power from the Project. This shall however not include the Interconnection Facilities.
Project line means 33 kV line from the Project to interconnection point at existing 33/11 kV Sub-station of the HPSEBL at Dhundhi in District Kullu, HP at the cost of IPP, operated and maintained, as a part of the Project, by the Company for the purpose of evacuation of power from the Project. This shall however not include the Interconnection Facilities."

Examples of Project line in a sentence

  • Page 1-35, Article 104-10 Maintenance of the Project, line 30, add the following as the last sentence of the first paragraph: The Contractor shall perform weekly inspections of guardrail and guiderail and shall report damages to the Engineer on the same day of the weekly inspection.

  • Page 1-39, Article 104-10 Maintenance of the Project, line 30, add the following as the last sentence of the first paragraph: The Contractor shall perform weekly inspections of guardrail and guiderail and shall report damages to the Engineer on the same day of the weekly inspection.

  • The District will determine the facility needs and the total connections on the Project line to be extended.

  • The pro-rata fee is the amount to be collected from future connections coming onto the Project line originally funded by the Constructing Applicant.

  • The sum of dollars ($ ); or when the Project is divided into sections for which separate outside plant plans and specifications are prepared, the sum of dollars ($ ) for each section requiring final documents; plus the sum of dollars ($ ) for each mile of Project line facilities included in the final documents.

  • Project line management should be responsible for directing decontamination efforts.

  • T2 Project line goes align with the main existing highway in order to mitigate total adverse impact.

  • The sum of llll dollars ($ llll); or when the Project is divided into sections for which separate outside plant plans andspecifications are prepared, the sum of llll dollars ($ llll) for each section requiring final documents; plus the sum of llll dollars ($ llll) for each mile of Project line facilities included in the finaldocuments.

  • The Project line of authority will be presented at the Preconstruction Conference.

  • January 2013 San Diego Gas & Electric Company high‐voltage power lines are rare and not documented in the Project area, the risk of electrocutions and collisions along the Project line should remain low.


More Definitions of Project line

Project line means the evacuation infrastructure from the
Project line means Subprojects of a similar type undertaken by an Energy Management Company in accordance with Paragraph B.1(a) of Schedule 2 to the Project Agreement.
Project line means the evacuation infrastructure from the generating station to the interconnecting sub-station of the licensee, to be provided, operated and maintained as a part of the project by the renewable energy generator(s) for the purpose of evacuation of power from the project;1[(sa) ‘Refuse Derived Fuel’ means segregated combustible fraction of solid waste other than chlorinated plastics in the form of pellets or fluff produced by drying, shredding, dehydrating and compacting combustible components of solid waste that can be used as fuel; and]
Project line means each separate and identifiable group of reports, data, software, charts, graphs and other forms of information related to a line of seismic exploration, which is gathered by the Company.

Related to Project line

  • direct line means either an electricity line linking an isolated generation site with an isolated customer or an electricity line linking an electricity producer and an electricity supply undertaking to supply directly their own premises, subsidiaries and eligible customers;

  • Project Land means any parcel or parcels of land on which the project is developed and constructed by a promoter;

  • Project Assets means all physical and other assets relating to and forming part of the Site including:

  • Environmental Infrastructure Facilities means Wastewater Treatment Facilities, Stormwater Management Facilities or Water Supply Facilities (as such terms are defined in the Regulations).

  • Project Contracts means collectively this Agreement, the Land Lease Agreement, the Construction Contract, O&M Contracts (if any) and any other material contract (other than the Financing Documents) entered into or may hereafter be entered into by the Concessionaire in connection with the Project;

  • Projects means the projects identified in Exhibit A to the Agreement and all other projects, any costs of which are included in a Transitional Capital Plan pursuant to the Act or are Recovery Costs, and financed, by payment or reimbursement, with the proceeds of Bonds or Notes.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • The Works/Project means the works to be executed or done under this contract.

  • Infrastructure facility means a building; structure; or networks of buildings, structures, pipes, controls, and equipment, or portion thereof, that provide transportation, utilities, public education, or public safety services. Included are government office buildings; public schools; courthouses; jails; prisons; water treatment plants, distribution systems, and pumping stations; wastewater treatment plants, collection systems, and pumping stations; solid waste disposal plants, incinerators, landfills, and related facilities; public roads and streets; highways; public parking facilities; public transportation systems, terminals, and rolling stock; rail, air, and water port structures, terminals, and equipment.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Infrastructure project means any construction or acquisition of treatment works,

  • Project Equipment means the items of machinery, equipment or other personal property used in connection with the construction and development of the Project pursuant to the provisions hereof, and all replacements thereof and substitutions therefor made pursuant to this Agreement.

  • Project Company means Company incorporated by the bidder as per Indian Laws in accordance with Clause no 3.5.

  • Project Location means the points or areas designated as such on Exhibit A and located on the ground by reference to points, stations, natural land features, improvements, or area boundary signs. STATE means the Oregon Department of Forestry, State Forester, or a duly Authorized Representative of the State Forester.

  • Project Companies means all Group Project Companies and Non-Group Project Companies together, each being a “Project Company”.

  • Lot Line means any boundary of a lot.

  • Rear lot line means the lot line that is opposite the front lot line in the case of a lot having four sides, and where the rear portion of a lot is bounded by intersecting side lot lines the point of intersection is deemed the rear lot line;

  • Project Property means the real property on or for which preconstruction service or construction work is or will be provided.

  • Idle facilities means completely unused facilities that are excess to the governmental unit's current needs.

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Production Facilities (7 9) means "production equipment" and specially designed software therefor integrated into installations for "development" or for one or more phases of "production".

  • Project Contract means any agreement or agreements for the design, development, acquisition, installation, implementation and construction of all or a substantial part of the Project by and between a Contractor and the Recipient.

  • The Works/ Project means the works to be executed or done under this contract.

  • Green infrastructure means a stormwater management measure that manages stormwater close to its source by:

  • Project Work means the work required to complete the Project.