Project Design Criteria definition
Examples of Project Design Criteria in a sentence
The listing below, may or may not contain all of the potential Project Design Criteria for a Project.
Unless otherwise authorized by BOEM, ▇▇▇▇▇▇’s OCS activities must comply with the standards in the Project Design Criteria and Best Management Practices found in BOEM’s notice (▇▇▇▇▇://▇▇▇.▇▇▇▇.▇▇▇/sites/default/files/documents// PDCs%20and%20BMPs%20for%20Atlantic%20Data%20Collection%2011222021.pdf) last revised on November 22, 2021.
Because the Owner and/or Project Design Criteria Professional has not issued a Certificate for Payment and has not notified the Design Builder of the reason for withholding certification as provided in Section 11.1.7 of this Exhibit A, or because the Owner has not made a required payment on a Certificate for Payment within the time stated in the Contract Documents.
The Project Design Criteria Professional’s approval of a specific item shall not indicate approval of an assembly of which the item is a component.
This Schedule of Values, unless objected to by Owner or Project Design Criteria Professional, will be used as the basis for Design Builder's Application for Payment.
The Project Design Criteria Professional will review and approve, or take other appropriate action upon, the Design Builder’s submittals such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents.
Performance-based criteria documents prepared by the Owner, or by the Project Design Criteria Professional retained by the Owner, establishing the scope of work for a Design Build Project, conforming to the requirements of §287.055(2)(j) F.S. The “Design Criteria Package” may include conceptual documents, program criteria and objectives, design performance specifications, design specifications, budget requirements, schedule requirements and other Project-specific technical materials and requirements.
In the event the Project Design Criteria Professional is not available or appropriate, the Owner shall provide an Initial Review of all Claims submitted by the Design Builder.
With regard to all resubmitted Submittals, Design Builder will in writing direct specific attention to revisions or other deviations which are different from or in addition to those required by Owner and/or the Project Design Criteria Professional on previous Submittals.
All required certificates of inspection, testing or approval will be obtained by Design Builder and promptly delivered to Owner and/or the Project Design Criteria Professional.