Process Manual definition
Examples of Process Manual in a sentence
In accordance with the State’s Project Development Process Manual, the Engineer, in cooperation with the State, shall plan, attend and document the Design Concept Conference (DCC) to be held prior to the 30 percent milestone submittal.
The Developer shall provide regular status reports to the NYISO in accordance with the monitoring requirements set forth in the Development Schedule, the Public Policy Transmission Planning Process Manual and Attachment Y of the OATT.
The Developer submits all documents and meets all requirements listed in Development Process Manual, Volume 1, Chapter 5, Work Order Process, and Figure 1, including submitting a Certificate of Insurance in a form acceptable to the City.
All designs shall be prepared in accordance with the latest version of: TxDOT Roadway Design Manual, TxDOT Project Development Process Manual, AASHTO Policy on Geometric Design of Highways and Streets, TxDOT Standard Specifications for Construction of Highways, Streets, and Bridges, TxDOT Traffic Operations Manual on Highway Operations, Texas Manual on Uniform Traffic Control (TMUTCD), and Highway Capacity Manual - Transportation Research Board.
The Designated Entity shall provide regular status reports to the NYISO in accordance with the monitoring requirements set forth in the Development Schedule, the Public Policy Transmission Planning Process Manual and Attachment Y of the OATT.
In accordance with the State’s Project Development Process Manual, the Engineer, in cooperation with the State, shall plan, attend and document the DCC to be held prior to the 30 percent milestone submittal.
In accordance with the State’s Project Development Process Manual, the Engineer, in cooperation with the State, shall plan, attend and document the Design Concept Conference (DCC) to be held prior to the thirty (30) percent milestone submittal.
The Developer shall provide regular status reports to the NYISO in accordance with the monitoring requirements set forth in the Development Schedule, the Reliability Planning Process Manual and Attachment Y of the OATT.
Order Handling Charges are payable by the Recipient to the Range Holder (as defined in the Process Manual).
In accordance with the State's Project Development Process Manual, the Engineer, in cooperation with the State, shall plan, attend and document a Design Concept Conference (DCC).