preventative maintenance (PM) definition
Examples of preventative maintenance (PM) in a sentence
The Contractor shall furnish all labor, materials, equipment, software, and supplies necessary to perform preventative maintenance (PM) and as-needed repairs for BAS and components of the BAS system per the minimum requirements outlined below.
This includes all phases of preventative maintenance (PM) work such as visual inspections, operational checks, oil and filter changes, equipment lubrication, fluid level checking and filling coolant system checks and servicing, battery servicing, and related incidental minor maintenance and repairs (such as fan belt replacements and adjustments, spark plug, shock absorber, and radiator hose replacements).
This specification describes the preventative maintenance (PM) inspections, oil change, lube, radiator service, and fuel filter replacement for transit vehicles.
During each preventative maintenance (PM) visit Onsite AV Service Partners, LLC’s authorized technician(s) shall perform the following services as they relate to the COVERED EQUIPMENT outlined in Exhibit A.
In addition to the above-mentioned extension of warranties for coverage up to five (5) years on parts and labor, we also through TRUE and our affiliates offer preventative maintenance (PM) agreements.
Ford AV shall perform a pre-scheduled service call for the purpose of conducting routine preventative maintenance (PM) and to check the general operation of equipment.
During inspections the contractor shall make use of preventative maintenance (PM) work orders provided by the service manager.
Contractor shall provide service, preventative maintenance (PM), software updates, and consumables for two (2) AB Sciex QTOF X500 instruments with Shimadzu Liquid Chromatographs and one (1) AB Sciex QTOF X500 instrument with a Sciex Liquid Chromatograph to the County as detailed below.
St. John’s will preauthorize vehicle repairs and preventative maintenance (PM) up to $500 dollars.
The City of Austin Police Department (APD) seeks a qualified Contractor for preventative maintenance (PM) and repairs on the Shimadzu GC2010 Plus with HS20 Headspace Autosampler and associated equipment within the APD Forensic Chemistry Laboratory.