Pressure Zones definition

Pressure Zones means for the purposes of this Ordinance subdivisions within the “Potable Water” System, the “Non-Potable Irrigation System”, and the “Recycled Irrigation Water System”, which are hydraulically isolated from the main distribution system and have their own unique hydraulic characteristics and associated energy requirements for delivery.

Examples of Pressure Zones in a sentence

  • The project site identified in the Water System Master Plan is CAP-01and described in Table ES-4 Recommended Water Distribution System Capital Improvements Program as well as on Figure ES-3A Recommended Improvements for Lower and Higher Pressure Zones (copies of both included as Appendix A to this proposal).

  • F&L has completed the 90% design for the portion of the project along Haven Avenue referred to as the CAP-01 project identified in the Water System Master Plan is CAP-01 and described in Table ES-4 Recommended Water Distribution System Capital Improvements Program as well as on Figure ES-3A Recommended Improvements for Lower and Higher Pressure Zones (copies of both included as Appendix A to this proposal).

  • Following the Residential Tenancies (Amendment) Act 2021, the rent increases in Rent Pressure Zones are capped in line with the rate of general inflation or 2% a year, whichever is lower.

  • Construction of 6 No. operator house Water Utilities Corporation Procurement of a Works Contract for The Molepolole Water and Sanitation Project - Contract 2 Catchment No. 1 - Sewage Collection Network and Water Pressure Zones 2 & 6 – Distribution Main.

  • As past present a landlord may set the chance rent even terminate the commonplace is located in what flame to be termed Rent Pressure Zones of having more later.

  • Water System Assets (2017) Quantity Notes Water Tanks 8 5 Pressure Zones Land 7 Parcels 2.68 acres total Water Lines 414 feet 1 inch 23,686 feet 2 inch 1,356 feet 3 inch 3,108 feet 4 inch 71,714 feet 6 inch 16,649 feet 8 inch Pump Stations 6 SCADA System New in 2016 Equipment Tools, Truck, Compressor, etc.

  • In order to extend City water service to the Land, the Water Director determined in Water Service Extension Request No. 2189 ("SER No. 2189") that the extension of City water service to the Land will require the water improvements in the Southwest A and Southwest B Pressure Zones described in SER No. 2189 (collectively,"Water Service Extensions") and such water service is conditioned upon such improvements being made.

  • This drafting process addresses tenant notice information requirements in relation to rent reviews for both existing tenancies and new tenancies which are located either in, or outside of, Rent Pressure Zones (RPZs).

  • However, Rent Pressure Zones (RPZ) ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■‌‌‌ ■ ■ ■ ■ ■ ■ ■ .

  • Procurement of a Works Contract for The Molepolole Water and Sanitation Project - Contract 3 Catchment No. 2 - Sewage Collection Network and Water Pressure Zones 1 & 5 – Distribution Main.