Preliminary Project definition

Preliminary Project means a project which outlines the conceptual and basic design elements and factors of a particular healthcare premise, including the list of the required items and possible locations, which is prepared based on the ground, soil and land investigations as required by the final requirements program and by making use of the existing information on the maps, which also proposes one or more solutions incorporating the drawings, cross-sections, appearances and profiles prepared based on the information and data provided by the Environmental Impact Assessment (EIA) and feasibility report, as applicable;

Examples of Preliminary Project in a sentence

  • Format Preliminary Project Descriptions to match that specified by the latest edition of the Construction Specification's Institute's "Manual of Practice".

  • The Owner will provide the Preliminary Project Cost and general schedule for the Project.

  • Exhibit A Scope of Company Work Exhibit B Preliminary Milestone Schedule Exhibit C Scope of Developer Work Exhibit D Insurance Requirements Exhibit E Preliminary Project Description Exhibit F Existing Line Property Description; General Terms, Provisions and Conditions of Conveyance Schedule I Real Property Standards Schedule II Environmental Due Diligence Procedure The Company Work shall consist of the Project Plan Work and the Implementation Work as described below.

  • All Float contained in the Project Schedule, as shown in the Preliminary Project Baseline Schedule or as generated thereafter, shall be considered a Project resource available to either Party or both Parties as needed to absorb delays caused by any event, achieve schedule milestones, interim completion dates and/or Completion Deadlines.

  • The Project Baseline Schedule shall include the Baseline Substantial Completion Date set forth in the Preliminary Project Baseline Schedule.

  • PWRF’s responsibility for cost overruns includes responsibility for those due to unforeseen conditions that must be addressed for the Project to proceed, but only to the extent such conditions can be remedied with resources available within the Preliminary Project Budget.

  • Proposer’s Preliminary Project Baseline Schedule submission shall not limit, modify or alter TxDOT’s ability to review and approve the Preliminary Project Baseline Schedule, and selection of a Proposer shall not be deemed to be acceptance or approval of Proposer’s Preliminary Project Baseline Schedule.

  • Funds required for any increases in the Preliminary Project Budget necessary to complete the Project substantially consistent with the Final Project Design (as potentially modified under this Agreement) shall be provided by PWRF from sources other than the City, except as specifically provided herein.

  • In addressing such additional cost, PWRF may, among other measures, apply contingency funds within the Preliminary Project Budget, make modifications to the Final Project Design, and apply such additional funds that PWRF, in its sole discretion, determines to provide to increase the Preliminary Project Budget.

  • The Facilities Program (see Article 2) describes the intended project scope and character along with the anticipated Project Schedule and the Preliminary Project Cost.

Related to Preliminary Project

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Expansion Project has the meaning set forth in Section IV.3.a of this Agreement.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Public project means any of the following:

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan;