Power Load definition
Examples of Power Load in a sentence
Onboard Power Load Margin Low Step through variable current loads (8 steps minimum current to maximum) Nominal Nominal Margin High Margin High Margin Low Minimum Step through variable current loads (8 steps minimum current to maximum) Minimum Step through variable current loads (8 steps minimum current to maximum) Minimum Table 1: list of repetitive tests These measurements are recorded as part of normal BIST testing.
In accordance with national energy saving and emission reduction requirements and pursuant to “Chongqing Power Load Management Devices Installation Management Rules” (Shisandian[1998]8), for the convenient of devices maintenance management, when the power load management devices sponsored by the electricity consumer are transferred to the electrify supplier voluntarily, the electricity supplier shall be responsible for the operation and maintenance of the power load management devices.
The O&S costs shall update the fuel consumption cost presented during Phase I and all phases of ship operation including pier side costs (shore power) based on the operational profile provided in the System Specification, Attachment J-1, and supported by the Electric Power Load Analysis.
HEMSI has a maintenance contract in place for the Stryker Power Pro Stretcher and Stryker Power Load system.
Station Power Load Reference value will be established by measuring its Retail Station Power loads at Idle Charging State, prior to issuance of the Permission To Operate (PTO) letter by PG&E.1 This reference point will be set initially via field tests and will at each anniversary adjust based on the maximum demand values obtained in the prior 12 months.
The Concessionaire shall commence the development and upgradation of the Facility within 30 days of the Compliance Date and ensure that substantial completion of the Facility (like Staff as per norms, Installation of the Furniture /Equipment, Availability of Power Load as per norms etc.) is achieved by .
The initial Station Power Load Reference Value kW 1 Per PG&E Rule 21, all energy resources, including storage facilities are not permitted to operate in parallel with the PG&E grid until after all Rule 21 requirements are met including Customer’s receipt of a Permission to Operate letter from PG&E.