Examples of Power Fluctuation in a sentence
TWC 12-07 Issued Power Fluctuation Detection And Analysis 9143379 9/22/2015 USA Time Warner Cable Enterprises LLC 12.
A final workshop, Power Fluctuation, took place in Denmark February 2009.
In particular, the following Performance Standards in Attachment B (Facility Owned by Seller) to this Agreement may be revised: Section 3(C) (Ramp Rates); Section 3(D) (Power Fluctuation Rate); and, Section 3(M) (Frequency Regulation).
Study 1: Development and Initial Test of the Power Fluctuation Scale (PFS)In Study 1, we sought to build on the Pilot Study results by developing a more reliable measure of power fluctuation – the Power Fluctuation Scale (PFS) – and establishing the convergent and discriminant validity of this measure using three independent samples.
Power Fluctuation: Any loss or damage resulting from power outage, power surges or dips, fluctuating voltage, inadequate or improper voltage or current.
Karaipoom, “Cooperative Control of SFCL and SMES for Enhancing Fault Ride Through Capability and Smoothing Power Fluctuation of DFIG Wind Farm,” IEEE Trans.
Finally, we develop and validate methodological tools that future researchers can use to extend our findings including the Power Fluctuation Scale (PFS, Study 1), laboratory and online experimental paradigms (Studies 2 and 3), and a simple measure to assess power fluctuation in everyday life (i.e., SD of reports of momentary power, Study 4).
To address this issue, we developed and validated a new Power Fluctuation Scale (PFS) in the next study.him/her to feel stressed (ICC = 0.90), and frustrated (ICC = 0.88), anxious (ICC = 0.86), and uncertain (ICC = 0.79; from 1 = not at all to 5 = extremely; for work that uses similar indicators of psychological distress see Hamill et al., 2015; Tepper, 2000; Tepper et al., 2007).
Power Fluctuation (March 14-27, 2012)Using wave energy as emergency generation must consistently provide enough power to sustain emergency services in the aftermath of an emergency.
This implies customer agreed that EEU‟stechnicians are professional to repair, also they perceived that all mean value of timeliness items of the service quality measures are below 3.40, that means lowest agreement level, So EEU users in the study area disagreed with the delivered service of timeliness in the study area.Table 4: Power Fluctuation as a factor of customer Satisfaction NMinimumMaximu mMeanStd.