Potholing definition

Potholing means an excavation process that involves making
Potholing means the practice of digging a test hole to expose underground utilities to ascertain the horizontal and vertical location of the facility.
Potholing means an excavation process that involves making a series of small test holes to accurately locate underground lines. Potholing is also known as daylighting.

Examples of Potholing in a sentence

  • Potholing process to include horizontal and vertical alignment and depth details.

  • Potholing of existing utilities within the proposed Project alignment will be performed at critical crossings identified by F&L to determine the horizontal and vertical position of select utilities and to verify the proposed vertical and horizontal alignment.

  • Potholing using the soft dig method (vacuum soil extraction system) is preferred.

  • Potholing or the relocation of existing buried utilities are not included in Consultant’s scope of work.

  • Potholing services to expose an underground utility to identify its positive horizontal and vertical location.

  • Potholing is not included in this scope of work but can be added if requested.

  • Potholing or other exploratory (e.g. additional video or service location methods) may be required during design and/or construction of this project.

  • Potholing for subsurface utility engineering (SUE) is not included.

  • Any potholing authorized by this License shall be subject to the requirements of Section 7(p) [Potholing] below.

  • Service Rates Two (2) Person Potholing Crew $ per hour One (1) Person Survey Crew $ per hour Two (2) Person Survey Crew $ per hour Three (3) Person Survey Crew $ per hour Two (2) Person traffic Control Crew $ per hour Mark areas in white for USA, plan traffic control, and other $ per hour permits.


More Definitions of Potholing

Potholing means a term used for the method of exposing an existing underground facility, by the means of hand digging, for the purpose of determining the facilities exact location.
Potholing means excavating the area above an underground facility to determine the precise location of the underground facility, without damage to it, before excavating within two (2) feet of the marked location of the underground facility, as required in Minnesota Statutes, Section 216D subd. 3a.
Potholing to expose other existing subsurface utilities during construction in order to maintain clearance and avoid damage to underground facilities during HDD installation activities is exempt from further review under this PA. 1. HDD installation of new infrastructure that occurs within the vicinity of other existing subsurface utilities require that the existing utilities be periodically exposed via excavation to ensure the new infrastructure does not conflict with existing utilities. The method of exposure is referred to as “potholing.” Potholing is required by code whenever new infrastructure is within forty-eight (48) inches plus half the diameter of an existing utility. Potholing involves removing an approximately nine (9)-inch-diameter soil column from the ground surface to the top of the existing utility via a vacuum truck. Potholing intervals are determined in the field and are conducted to the minimum extent necessary to ensure that new infrastructure maintains proper clearance from existing utilities. Potholing will typically occur within previously disturbed soils overlying the existing utilities, as most of the existing utilities requiring exposure are large enough to have required installation via mechanical trenching (e.g., water and sewer mains). Because potholing requires minimal ground disturbance and occurs only above existing utilities, there is minimal potential for this activity to adversely affect historic properties. Furthermore, areas to be potholed could not be archaeologically surveyed safely, and archaeological monitoring would be ineffective because the soil is vacuumed into a truck and the resulting hole is too small for adequate archaeological inspection. Therefore, potholing is exempt from further review under this PA.
Potholing pavement cores to expose existing utilities shall be made with an 18” diameter keyhole pavement core. Pavement core locations shall not be placed in the wheel path whenever possible. Vacuum excavation shall be utilized to expose underground utilities. Pavement cores shall be repaired within the same working day. The pavement core shall be retained and reused to fill the core hole.
Potholing. It is assumed that 8 potholes (4 feet x 4 feet x 6 feet deep) will be required. City approval is needed prior to proceeding with this task. Exact timing of the potholing will be coordinated with the City and may occur during a later project phase. Potholing will be performed by a subconsultant.

Related to Potholing

  • Barbering means any one or combination of practices done upon the upper part of the human body for cosmetic purposes and when done for payment either directly or indirectly for the general public, constitutes the practice of barbering, to wit: shaving or trimming the beard or cutting the hair; giving facial or scalp massages or treatment with oils, creams, lotions or other preparations, either by hand or mechanical appliances; singeing, shampooing or applying lighteners or color to the hair, applying hair tonics; applying cosmetic preparations, antiseptics, powders, oils, clays or lotions to scalp, face, neck or upper part of the body, but excluding the application of makeup; and removing superfluous hair from the face, neck or upper part of the body.