Post Design Services definition

Post Design Services means further development work undertaken after drawings have been certified, and after acceptance into service to assess Authority originated System Requirements changes or product build standards.

Examples of Post Design Services in a sentence

  • Perform Post Design Services in accordance with the Commission’s problem statement.

  • Permit fee renewals and extensions, as necessary, shall be paid for under Post Design Services.

  • Post Design Services are not intended for instances of CONSULTANT errors and/or omissions.

  • Task 1 Post Design Services $ 10,425.12 Time and Materials Task 2 Survey (Sub-consultant) $ 3,000.00 Lump Sum Total Fee $ 13,425.12 Lump Sum CONSULTANT shall commence professional services upon written receipt of Notice to Proceed (NTP) from CITY.

  • Simultaneously with the payment or delivery of the aggregate Purchase Price, the Designees shall be identified as the recipients of the Issuable Shares.

  • Post Design Services may include, but not limited to, meetings, construction assistance, plans revisions, shop drawing review, survey services, as-built drawings, and load ratings.

  • Post Design Services may include, but are not limited to; meetings, construction assistance, providing interpretations and clarifications, shop drawing and product submittal review and record drawings.

  • Ad Hoc Post Design Services (PDS) involves all engineering activities necessary to preserve equipment capabilities at the performance levels formally approved by the Authority and may be used to identify and authorise minor enhancements such as meeting new/safety legislation, or for reducing in-service support costs.

  • Post Design Services will consist of responding to contractor’s questions during bidding, review of shop drawings and responding to questions during construction.

  • If the Authority wishes to place an order for Post Design Services Activity (Line Item 5 of Schedule 2) the following process shall be adhered to: All work under Line Items 5 shall be on a task by task basis using the Task Authorisation Form (TAF) at Appendix 9 of Schedule 10.