PM Peak definition
Examples of PM Peak in a sentence
Developer shall pay at building permit issuance for the first building in the Project following the City’s issuance of permits for construction of the mitigation improvements its proportionate share based on 3 new PM Peak hour trips at these intersections out of a total of 58 PM peak hour trips generated by the College, provided that Developer's cost shall not exceed 5.2% of the cost of the mitigation improvements.
Developer shall pay at issuance of the first building permit for the Project following the City’s issuance of permits for construction of the mitigation improvements its proportionate share of the improvements based on 3 new PM Peak hour trips out of a total of 21 trips generated by the College, provided that Developer's cost shall not exceed 14.3% of the cost of the improvements.
To ensure that Project-generated net new PM Peak hour trips remain within the CRA Trip Budget, the City shall maintain an accounting of the Project’s net new PM peak hour trips using the methodology in Exhibit K and an accounting tool consistent with Exhibit K.
Upon the Developer’s satisfaction of requirements in Sections 3.3, 3.4 and 3.5.2 of this Development Agreement, 8,152 Daily and 721 PM Peak Hour trips shall be reserved for the Project, as depicted in Exhibit “D” (the “Initial Reserved Capacity”).
PM Peak Period Analysis The same improvement scenarios were investigated in the PM peak period analysis.
Developer shall complete the design of the Project roadways in a manner that meets or exceeds performance requirements shown in Table 11-1 below for both AM and PM Peak Hour DHV for the Design Year.
The pro-rata share is based on the PM Peak Vehicle Trips within the Sunrise Boulevard/Greenback Lane intersection associated with the anticipated development.
MAP = Million Annual Passengers Source: ▇▇▇▇ & Peers, 2014 As shown in Table 5, in 2021, the incremental increase in MAP to 11.8 over existing levels would result in an additional 711 trips in the AM Peak Hour and 720 trips in the PM Peak Hour.
Utilizing Synchro software, projected volumes will be inputted, and proposed AM Peak, PM Peak & Off-peak signal timings will be developed for implementation.
The City hereby determines that the Project has met the requirements of the City’s Transportation Concurrency Management System and is entitled to 1,072 vested PM Peak Hour trips (“Vested Trips”) generated by the 1,051 single family detached units and 180 single family attached units.