Planning Level Cost Estimate definition
Planning Level Cost Estimate means the estimate that is shown in the STIP. This is considered a preliminary estimate due to the limited availability of project details. It should be identified in the STIP as three separate line items: preliminary engineering, ROW if purchased by SCDOT, and construction.