Planned Outage Factor definition

Planned Outage Factor means the ratio of annual un- served energy (MWh) due to planned work that generally involves an overhaul work, either on a unit or component, to the installed plant capacity (MW) multiplied by 8760 hours.
Planned Outage Factor means planned outage hours divided by the period hours and multiplied by 100% when measured on a per unit basis or the sum of the planned outage hours multiplied by the gross maximum generation per unit for all of the units in the active state and then divided by the gross maximum generation for the plant on a total plant basis;