Pilings definition

Pilings means timber, metal, concrete or other similar structures driven, dropped, poured, or placed to support a vertical load.

Examples of Pilings in a sentence

  • Pilings are proposed to be placed in the confining layer (aquitard), but will not pass through it and are unlikely to represent a conduit for contaminant transport given the nature of the soils making up the aquitard.

  • Item Quantity Unit Price 12471-813--01-25 - Dock Pilings 8 each Delivery Location City of Fort Lauderdale No Location Specified Qty 8 DescriptionDock Pilings: Provide a this service shall be req rate to furnish all material, labor, and equipment to demolish and dispose of designated dock pilings.

  • Pilings and piers necessary to support bridges or nearshore components of the alternatives could alter the nearshore migration pathways of smaller juvenile salmonids (e.g., pink and chum salmon) or other marine species in Tongass Narrows.

  • CONSIDERATION: Boat Dock with Enclosed Boathouse with Slip, Boat lift, Walkway, 13 Pilings, and Two Breakwater Pilings: No monetary consideration pursuant to Public Resources Code section 6503.5.

  • SpaceX will fund the development and production of five (5) interpretive signs (in English and Spanish) that describe the history and significance of the historic properties in the APEs, including the Pilings Camp Site.

  • Pilings will be installed at the location and in the manner specified by the contractor.

  • Nearby is the Airport Fence, Pilings, and Collapsed Structure site (▇▇▇-669).

  • Pilings will be driven hydraulically to the depth necessary to develop skin friction sufficient to enable the piling to support the foundation, or until the pilings encounter rocks or other strata capable of supporting the foundation.

  • SpaceX will fund the development and production of five (5) interpretive signs that describe the history and significance of the historic properties in the APE, including the Pilings Camp Site.

  • Prior to the first Starship/Super Heavy launch, SpaceX has hired a qualified professional who performed a pre-launch condition assessment and with an appropriately qualified engineer with experience in vibro-acoustic measurement who took baseline vibration levels at the Palmetto Pilings 1936 Centennial Marker, Palmetto and Cypress Bridge Pilings site, and the Port ▇▇▇▇▇▇ Lighthouse.