Piezometers definition

Piezometers or “Piezometer borings” means the geotechnical borings installed in 2015 and located in the right-of-way and used to measure water levels in the ▇▇▇▇ ▇▇▇▇ (Exhibit E). Borings are to be capped and abandoned at completion of project.
Piezometers or “Piezometer borings” means the geotechnical borings installed in 2015 and

Examples of Piezometers in a sentence

  • To monitor the above said different parameters of the valley slope behavior,the instruments namely “SlopeInclinometer”, “Strain Gauges”, “Earth Pressure / Load Cells”, Piezometers and Settlement Gaugesare installed at various positions on the composite structure for such monitoring purpose.

  • Volente acknowledges that the Intake Facility, Maintenance Building, Intermediate Drop Shaft, Piezometers, ▇▇▇▇▇▇▇ St Autoturn and Tunnel are critical components, and that Site 4 is the agreed location for the Maintenance Building.

  • Volente further understands that the Intermediate Drop Shaft will be located on a temporary construction easement and that Piezometers installed in 2015 are located in the Lime Creek Road right-of-way and that the Tunnel will be constructed underground in part within the Village’s city limits.

  • Piezometers shall be installed in six borings (one on each side of 101 and 880 and two as field-located) where long-term monitoring of groundwater levels is necessary.

  • Piezometers may be installed in all mining areas to monitor aquifer response.

  • Piezometers were installed in thirteen of the borings, in order to characterize the groundwater conditions within Site.

  • Piezometers (open standpipe or vibrating wire) shall be set in the field along the alignments for monitoring of the groundwater table as the Work Assignment dictates.

  • The Vibrating Wire Piezometers (VWPs) and standpipe piezometers will be monitored concurrent with inclinometer measurements.

  • BCRUA and Volente agree to a Joint Pre-construction Condition Assessment of roads to be utilized for the BCRUA Project during the construction of the Maintenance Building, Intermediate Drop Shaft, Piezometers, Roadway Improvements, and Tunnel, by a mutually agreed upon third party.

  • With respect to the design, construction and operation of the Intake Facility, Maintenance Building, Intermediate Drop Shaft, Piezometers, Roadway Improvements, and the Tunnel, Volente agrees to deal with the BCRUA in a reasonable fashion and in good faith with respect to imposing and enforcing the Ordinances.