PGCIL or “POWERGRID” shall mean Powergrid Corporation of India Limited.
PGCIL means Power Grid Corporation of India Limited;
PGCIL or “POWERGRID” shall mean Power Grid Corporation of India Limited.

Examples of PGCIL in a sentence

  • However, any changes to be made or any additional requirement for complying with relevant rules, the same shall be conveyed to SPD to comply or it would be complied by SPIA or PGCIL and cost thereof shall be recovered from SPD on pro-rata basis.

  • For commercial settlement, inter-connection point or delivery point shall mean the point at 220 kV side of 400/ 220 kV PGCIL Substation of CTU.

  • A set of Main and Check Meters of 0.2S accuracy class, as per CEA (Installation & operation of meters) Regulations 2006/IEGC as applicable or as specified by power procurer i.e GUVNL or PGCIL, shall be Procured and installed by SPIA on each incoming feeder at 33KV side of 33/220kV Internal Pooling Sub station.

  • Metering shall be at 33kV side of 220/33kV substation where the power from the solar power project is injected and at the 220 kV Side of 400/220kV substation of CTU i.e., PGCIL.

  • Metering shall be at 220 kV side of 400/220kV substation of CTU (PGCIL) i.e. interconnection point for billing purpose.

  • For commercial settlement, inter- connection point or delivery point shall mean the point at 220 kV side of 400/ 220 kV PGCIL Substation of CTU.

  • If any new sub-vendor is proposed by the bidder, it may be approved and if it is acceptable on consideration that the proposed Sub Vendor made previous supplies to DVC or is included in the approved list in any other DVC / PGCIL / NTPC Project for similar supply.

  • The SPD shall follow the technical requirements for Grid Solar PV Power Plants as mentioned in Annexure-III of MNRE Guidelines or any technical specification issued by GUVNL, CEA, WRLDC, CTUIL, PGCIL, POSOCO etc.

  • Another set of Main and Check Meters of 0.2S accuracy class, as per CEA (Installation & operation of meters) Regulations 2006/IEGC as applicable or as specified by power procurer i.e GUVNL, shall be Procured and installed by SPIA on each incoming feeder at 220KV side of 400/220kV Grid Sub Station (Interconnection point) of CTU i.e. PGCIL based on specifications & make provided by GPCL/GUVNL/PGCIL.

  • The Petitioner filed Petition No. 36/MP/2022 (related to ACME Deoghar and ACME Dhaulpur covered in the Petition No. 103/MP/2021) and Petition No. 35/MP/2022 (related to ACME Phalodi and ACME Raisar covered in the Petition No. 104/MP/2021) seeking directions to SECI to extend SCOD of the Petitioner’s projects up to 18.7.2023 and directions to PGCIL to align the date of commencement of LTA with SCOD of their projects as extended by SECI.


More Definitions of PGCIL

PGCIL means Power Grid Corporation of India Ltd.
PGCIL means the Power Grid Corporation of India Limited.
PGCIL means Power Grid Corporation of India Limited, which has been notified as Central Transmission Utility.
PGCIL or “Powergrid” means Power Grid Corporation of India Limited.
PGCIL means Power Grid Corporation of India Limited, a Central Transmission Utility notified under sub-section (1) of section 38 of the Act;

Related to PGCIL

  • CIL means Coal India Limited or the Subsidiary Company of CIL or areas falling under various subsidiaries of CIL where Goods are deployed/ used;