Pencil definition

Pencil or “Chin-strap” beards;
Pencil. Requisition Meeting and Walk-Through. Commencing with the calendar month prior to the calendar month in which Developer anticipates that funding of the first draw under Developer’s construction loan will occur and continuing until completion of all Punch List Items (as hereinafter defined) (and subsequent to Closing, as applicable, as set forth in Section 5.02(g) below), SCA’s Project Representative shall attend a monthly “pencil” requisition meeting and walk-through of the School Unit, which “pencil” requisition meeting and walk-through shall be conducted by Developer’s construction lender’s inspecting engineer, Developer’s Construction Manager(s) and Developer. Developer presently anticipates that such “pencil” requisition meeting and walk-through will occur on or about the 25th day of each month. At the conclusion of each “pencil” requisition meeting and walk-through: All School Base Building Hard Costs and School Base Building Soft Costs covered by the “pencil” requisition shall be deemed approved, unless and except to the extent any such costs have been specifically disapproved by Developer’s construction lender’s inspecting engineer.

Examples of Pencil in a sentence

  • Contractor shall promptly respond to Pencil Drafts or Contractor's Pay Applications may be delayed.

  • Contractor's failure to promptly respond to a Pencil Draft shall qualify as a delay in the Prompt Payment of a Request for Payment or Request for Retention.

  • This review of Payment Applications is sometimes called a “Pencil Draft.” Return of a Pencil Draft shall constitute the Owner's dispute of the Pay Application that has been submitted.

  • This review of Payment Applications is sometimes called a “Pencil Draft.” Owner's return of a Pencil Draft shall constitute the Owner's dispute of the Pay Application that has been submitted.

  • On or before the 25th day of the month immediately preceding a month in which the Construction Manager will submit an Application for Payment, the Owner, the Architect (if required by the Owner) and the Construction Manager shall meet to review a preliminary draft of such Application for Payment (hereinafter referred to as a "Pencil Draw") prepared by the Construction Manager.

  • RIDOT DBE Utilization form Apprenticeship utilization reports Certified Payrolls Partial Lien Releases Cost Loaded Progress Schedule Digital Progress Photos (Labeled) Real time Punch List Items Addressed Pencil pay applications shall be submitted digitally (unlocked MS Excel Format) to Owner on a thirty (30) day billing cycle, by.

  • The Construction Manager shall revise the Pencil Draw in accordance with any objection or recommendation of either the Owner or the Architect that is consistent with the requirements of the Contract Documents.

  • Beater 1 - Ballpeen Hammer Torch Striker Pencil Scribe Soapstone No. 5 Shade Cutting Goggles Wire Spool & Belt No. 9/7 Side Cut Pliers 6’ Folding Rule Diagonal Cut Snips Torpedo Level ▇▇▇▇▇ ▇▇▇ & Line Chalk Line ▇▇▇▇▇ Wrench Set ▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇-▇▇▇▇▇▇ ▇▇.

  • Paediatric: Gauge: 22G: i) 25-30mm (length) ii) 50mm (length) 25G: i) 25-30mm (length) ii) 50mm (length) 26G: i) 25-30mm (length) ii) 50mm (length) - Should be stainless steel - Single lumen - Should be sterile - Package intact and acceptable - Firm fitting syringe - Expiry date must not be less than 2/3 shelf - Date of manufacture and Date of Expiry indicated - Pencil point bevel with introducer - Sample must be provided - Clear hub to visualize csf.

  • The initial Core Group will promptly review the Payment Application to confirm compliance with the amounts approved in the Pencil Draw and the terms of the Contract Documents.