Peak Load Management Project definition

Peak Load Management Project or “PLMP” means a load management project that produces Committed Capability by the reduction of electric load through means other than the permanent closure of a building or other location at which electricity is consumed. A PLMP may consist of the aggregated capability of a number of consumers to reduce electric load, provided that (i) all such consumers are ultimately interconnected with the ISO Controlled Grid or the Distribution Grid; and (ii) all such loads can be aggregated to a single transmission or distribution substation. The PLMP or PLMPs providing Committed Capability under this Agreement are identified on Schedule A.