Parallel cost estimate definition

Parallel cost estimate means the method for estimating the eligible project construction cost for a proposed project that, as determined by the department, includes more than is necessary to correct a violation of a maximum contaminant level. Two cost estimates are prepared. The first is a detailed cost estimate of the project as proposed. The second, parallel, cost estimate is for a project designed to only correct the MCL violation.
Parallel cost estimate means a ratio developed by using as the numerator the cost of a project exclusive of costs added for those items under s. NR 162.07(1)(b)1., 2., 4. and 5., and as the denominator the cost of the project inclusive of those items.

Related to Parallel cost estimate

  • Cost Estimate means the detailed projected expenditure, including material costs and overhead, equipment costs and overhead, labor costs and overhead, and all taxes associated with each major material and service component, required for a line extension. It shall also separately identify any incremental costs associated with providing premium services. The Company may, for the purpose of standardization, establish standard construction cost estimates, for basic or premium service plans, which shall not exceed, in any event, the average cost of constructing such line extensions in the area involved, in which case the term “cost estimate” as used in this section will be understood to mean the standard estimate thus established.

  • Parallel operation means the Generating Facility’s electrical apparatus is connected to the Transmission Provider’s system and the circuit breaker at the point of common coupling is closed. The Generating Facility may be producing electric energy or consuming electric energy at such time.

  • Estimate means to be based on technical evaluation of the sources contributing to the discharge including, but not limited to, pump capabilities, water meters, and batch discharge volumes.

  • Response Costs means all costs, including, but not limited to, direct and indirect costs, that the United States incurs in monitoring and supervising Respondents’ performance of the Work to determine whether such performance is consistent with the requirements of this Order, including costs incurred in reviewing deliverables submitted pursuant to this Order, as well as costs incurred in overseeing implementation of this Order, including, but not limited to, payroll costs, contractor costs, travel costs, and laboratory costs.]

  • Operating Costs means the incremental operating expenses incurred on account of the Project implementation, management and monitoring including rent for buildings; office, vehicles, office equipment and other operation and maintenance costs; water and electricity utilities, telephone, office supplies, bank charges, additional staff costs, travel and supervision costs, per diem, but excluding the salaries of officials and public servants of the Project Implementing Entity or the Recipient’s civil service.