Operational Readiness Test definition

Operational Readiness Test. Outage shall mean a loss of the use of a Service. ------ Permanent Virtual Circuit (PVC) shall mean a pre-defined software routed ------------------------------- connection creating a virtual network path (circuit) which is always available without any call set-up delay.
Operational Readiness Test means the test described in Annexure 2 (Operational Readiness Test) to Schedule 5 (Transition Services Requirements); Operative Documents means the documentation listed in Schedule 8 (Reviewable Documents), and any other documentation agreed by MSD and the Provider to comprise Operative Documents;

Examples of Operational Readiness Test in a sentence

  • Once the new PLC control panels are shipped and installed in the field, Signature Automation will provide up to six days, of onsite support for the Operational Readiness Test (ORT).

  • The Contractor shall perform Operational Readiness Walkthroughs for the Department to review the findings of the Operational Readiness Test (ORT) it will have conducted during the Testing Phase.

  • Section 14.A.ii Operational Readiness Test (ORT) ....................

  • RFP Section 3.7, the Contractor shall conduct and complete the Operational Readiness Test, by December 16, 2005.

  • The CERES IT will support NPP-level mission readiness activities: which include mission rehearsal and Operational Readiness Test (ORT) activities.

  • During Operational Readiness Test and Operational Periods, the Service Provider must: - adhere to and report on the SLs and KPI’s; - identify, investigate and report failures in SLs and KPIs; and - must propose the action required to recover from and/or correct failures to achieve SLs and KPIs.

  • The JSP will be completed and agreed upon between both parties 120 days prior to the planned commencement of any operational test periods (Operational Readiness Test, Beta Test etc.) The basic underlying principles which will drive the development of the JSP are as follows: We will make the potentially fragmented nature of customer care delivery appear to be seamless to the customer.

  • The Operational Readiness Test shall be complete on or before December 16, 2005.

Related to Operational Readiness Test

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.