Offtakes definition
Examples of Offtakes in a sentence
When [ARP] submits Day-Ahead Nominations to ▇▇▇▇ regarding his Balancing Perimeter, [ARP] shall ensure that for each quarter-hour the nominated total Injection (which is the sum of all nominated day-ahead Injections by [ARP]) equals the total nominated Off-take (which is the sum of nominated day-ahead Off-takes by [ARP]).
In order to maintain parity of the interventions mentioned in the first paragraph of clause 4.2, and in light of different contributions in a jointly funded project, notably Catalyst’s contribution to projects through Contract Offtakes, the Sides understand that such asymmetric contribution will be recognised through the equivalency principles to be applicable on a case by-case basis and in function of the project needs.
Parties acknowledge that (as provided in, and without prejudice to the generality of, paragraph 2.5.1,2.4.1) upon the declaration of, and from time to time during the continuance of, a Network Gas Supply Emergency:, DNOs will secure that gas flows at NTS/LDZ Offtakes are in accordance with the instructions of Transco NTS (as directed by the NEC).
F2.2.2 Minimisation of CV Shrinkage In particular, if National Grid NTS provides guidance to the DNO as to the pattern of gas flows as between NTS/LDZ Offtakes serving an LDZ which may avoid or minimise the amount of CV Shrinkage, the DNO will endeavour to take account of such guidance in its Offtake Profile Notices and revisions thereof.
The Tariffs for operation of the electric system comprise the Tariff for operation of the electric system and the Tariff for Off-takes of additional reactive energy.
The binding Offtakes along with the Pre-Feasibility findings will be favourable for progressing these discussions.
Offtakes from the sump to the float switch pipe shall be equipped with mesh strainers.
Instantaneous Volume Flow Rate (Note 1) MCM/day Per relevant Supplemental Agreement ± 1.0% CV (for CV-Directed NTS/LDZ Offtakes) MJ/m3 35 – 44 ± 0.1 MJ/m3 CV (other NTS/LDZ Offtakes) MJ/m3 35 – 44 ± 0.3 MJ/m3 Instantaneous Energy Flow Rate (Note 1) TJ/day Per relevant Supplemental Agreement ± 1.1% Pressure ▇▇▇▇ 0 – 85 ± 0.5 ▇▇▇▇ Temperature °C 0 – 40 ± 1.0 °C Carbon Dioxide (where applicable – Note 2) Mole % 0 – 5 ± 0.01 mole %.
The Access Responsible Party charged with monitoring the (Net) Injected Energy will assume the obligations relating to Nominations for all the Off-takes and/or Injections of the Access Point(s) concerned.
CV (for CV-Directed NTS/LDZ Offtakes) MJ/m3 35 – 44 ±± 0.1 MJ/m3 CV (other NTS/LDZ Offtakes) MJ/m3 35 – 44 ±± 0.3 MJ/m3 Instantaneous Energy Flow Rate (Note 1) TJ/day Per relevant Supplemental Agreement ±± 1.1% of flow over the specified range.