NYC Building Code definition
Examples of NYC Building Code in a sentence
The Operator shall be required to remain in compliance with the NYC Building Code standards (“Code”).
The cost associated with storm hardening was not covered in the Q631/Q887 Part 1 Facilities Study and additional study is required per NYC Building Code Appendix G Flood -Resistant Construction which references ASCE 24‐14.
Responsible party to follow the more stringent design standards as prescribed by either NYC Building Code or the NYS Building Code.
Currently, The NYS Building Code references ASCE 24-14 (Code Reference Book) requiring design of critical infrastructure to the HIGHER of 3’ above the Base Flood Elevation or the 500-year flood as indicated by the FEMA Firm maps, which governs over the current NYC Building Code.
The Funder's intention is that the Grant will be paid to the Recipient in full.
The Authority shall indemnify and save each Fiduciary harmless against any losses, damages and other liabilities which it may incur, including all reasonable expenses, charges, counsel fees and disbursements, as aforesaid, in the exercise and performance of its powers and duties hereunder, and which are not due to its negligence or bad faith.
The system to provide heating and cooling as per the NYC Building Code and a Licensed NYS Professional Engineer.
The CONSULTANT shall design, fabricate, construct, deliver and install the following for the Education Center: Logo; Logo applications (e.g. letterhead, communications materials, vehicles, promotional posters, museum store product) with guideline manual; Large sculptural installation at entrance; Design elements for the 72-seat jazz room; and Signage in accordance with NYC DOT and 2014 NYC Building Code including all rules of the building department.
Sprinkler system (to be coordinated with Seller’s architect) as required by NYC Building Code · Fire alarm system w/speakers + strobes (to be coordinated with Seller’s architect), as required by NYC Building Code.
Curtain wall shall be designed to withstand wind loads in accordance to NYC Building Code.