NCRPC definition
Examples of NCRPC in a sentence
All such changes, with the additions or deductions in price therefore, shall be determined and agreed upon between the NCRPC and the Contractor before the changes are made.
Where two or more units of equipment or materials are required at the same work site, they shall be the products of a single reputable manufacturer, satisfactory to the NCRPC.
These records will be made available for audit purposes to the NCRPC or any authorized representative, and will be retained for three (3) years after the expiration date of this Contract, unless permission to destroy them is granted by the NCRPC.
In case any difference of opinion should arise between the Contractor and The NCRPC in relation to this Contract, the work to be performed under it, or in relation to the interpretation of the Work Write-up and Specifications, the decision of the NCRPC will be final and conclusive on all parties hereunder.
Time is of the essence, and in the event Contractor fails to perform hereunder in a timely manner, and this failure is not the fault of the NCRPC, the Contractor will be in breach of Contract.
As a result, there will be added to, or deducted from, as the case may be, the original Contract; price; such sums as are determined by the NCRPC for the same by standard prices on such work.
Contractor will at all times furnish to the NCRPC Inspector, and representatives of the State of Kansas, safe and suitable means of access to any and all parts of the work for the purpose of inspection.
Payment to the contractor will be made on either the 15th or last of each month, whichever date follows that date set forth in the contract for payment, provided all work contained in the contract have been certified as completed by NCRPC Inspectors.
Contractor should be aware that this project is being funded with the assistance of the Kansas Housing Resources Corporation weatherization grant funds and delays may occur in the receipt of funds from the State, which are beyond the control of the NCRPC.
If the Inspector determines, after inspection, that materials or workmanship are incomplete, unsatisfactory or unacceptable, Contractor shall return to the work site and make the necessary corrections at no additional cost to the NCRPC.