N13 definition
Examples of N13 in a sentence
The duty period shall begin at report time, as defined in Paragraphs N.1-3, and end at release time.
N13 IT Governance It will be the NDR Operators’ responsibility to govern the published NDR Technical Standards on behalf of CLG and monitor industry adherence to them.
N.13 The Company has prepared, kept and preserved complete, accurate and up-to-date records to enable it to deliver correct and complete Taxation returns and to calculate any liability to Taxation or entitlement to claim any relief in respect of Taxation.
However, the ID vaccination of the vaccine did induce local Non-response (N=13) 15.7 6.2 – 23.1 Neutral (N=4) 39.7 29.5 – 83.8 High response (N=4) 177.1 1.9 – 409.2 Non-reponse: DR3, DR7 and/or DR11, neutral: None of or both the HLA-DR and –DP alleles mentioned, high response: DR1, DR5, DR2, and/or DPB1*0401.
Studies were excluded because; (1) they did not include a s-TBI cohort defined by a GCS≤8 and/or AIS≥4 (N=134), (2) they did not report hospital costs for patients with s-TBI (N=28) or (3) in-hospital acute care costs were not distinguishable from other costs (N=13).
For Grids H15, I13, N10, and N13, the ▇▇▇▇-▇▇▇▇▇▇▇ exercise resulted in post-removal EPCs at or below background values.
MOU OWNER OF RECORD DUTY (AF) 2018 DUTY USED 2018 090 N13 E18 23CDDC2 5502 16835 QM ▇▇▇▇▇▇▇▇▇ WATER COMPANY 67.21 67.21 090 N14 E18 34BAAB1 4697 17044 QM ▇▇▇▇▇▇, ▇▇▇▇▇ 3.40 3.40 090 N13 E18 10AADB1 4698 17081 QM U.S.-FOREST SERVICE 1000.00 090 N14 E18 10CD 2 4929 17235 ▇▇▇ ▇▇▇▇▇▇▇ FAMILY TRUST AGREEMENT 0.51 0.51 090 N16 E18 22BAC 1 4941 17310 ▇▇▇ ▇▇▇▇▇▇, ▇.
B-001 Safety Run-In (N=13 patients) ▇▇▇▇▇▇▇ # ▇-▇▇ ▇▇▇/ ▇▇▇▇▇▇▇▇ ▇▇▇▇ Dose modification 2/2 Decrease Dose level -1 (500mcg) 2/3 Decrease Dose level -1 (500mcg) All subsequent patients* 0/13, 1/13, 2/13, 3/13 Continue at 1000mcg if 4 or more patients experience Grade 3 systemic toxicity attributable to the AE37 vaccine, the starting dose will be decreased to Dose Level −1 (500mcg) for all subsequent patients enrolled to the study and the Safety Run-In will commence as outlined below.
N9 0.06” × 45° N10 0.31” Drill × .25” deep – 4 holes N1 N7 N6 N5 N10 N2 N4 N13 N8 N9 N14 N3 ▇▇▇ ▇▇▇ Cone-Seal Nut Item * Dimension/Specification P1 – Q4 10° ± 30’ on each side.
N13 stated that it is of high importance and necessity to make the assurances enforceable, because participation is not free of commitment.