The TSP shall ensure that the Project is designed, built and completed in a good workmanship using sound engineering and construction practices, and using only materials and equipment that are new and manufactured as per the MQP and following approved FQP for erection, testing & commissioning and complying with Indian /International Standards such that, the useful life of the Project will be at least thirty five (35) years from the COD of the Project.
Cables, At least one type from each of the aforesaid 6 (six) materials to be utilized in substations and villages’ electrification shall be inspected by the RQM as per MQP.
Also, an approved copy each of Manufacturing Quality Plan (MQP) and Field Quality Plan (FQP) would be submitted to Independent Engineer & Nodal Agency in the same time period.
Documentation with regard to Manufacturing Quality Plan (MQP) & Field Quality Plan(FQP) shall be maintained by bidder/Employer and kept in proper order for scrutiny during the course of project execution by Quality Monitors .
Changes by the Supplier and/or its subcontractors to processes utilised in the manufacture of the valves shall be considered a deviation and shall follow the procedure detailed in IO document MQP Deviations and Non Conformities [2].
The materials to be used under the scheme shall be as per Technical Specification attached with Standard Bidding Document of IPDS scheme or as per latest relevant Indian Standards/ approved Datasheet/ drawings/ GTP/ MQP.
Also, an approved copy each of Manufacturing Quality Plan (MQP) and Field Quality Plan (FQP) would be submitted to Independent Engineer & Long Term Transmission System User in the same time period.
By: Name: /s/ W▇▇▇▇ ▇▇▇▇▇ W▇▇▇▇ ▇▇▇▇▇ Title: General Counsel By: Name: /s/ W▇▇▇▇ ▇▇▇▇▇ W▇▇▇▇ ▇▇▇▇▇ Title: Director Schedule “GR” to Master Distribution Agreement (Television Productions) dated July 25, 2007 between MQP, LLC, as Issuer, and Lions Gate Television, Inc., as Distributor (the “Agreement”).
Cables, At least one type from each of the aforesaid 6 (six) materials to be utilized in substations and town’s electrification shall be inspected by the PQM as per MQP.
PIA has to ensure that the quality of materials/ equipment supplied at site and execution of works carried out at field under IPDS scheme is in accordance to Manufacturing Quality Plan ( MQP)/ Guaranteed Technical Particulars ( GTP) and Field Quality Plan ( FQP)/ Approved Drawings/ Data Sheets respectively.