Mooring System Pre-Lay definition
Mooring System Pre-Lay using Anchor Handling and Tug Supply vessels and specialist Remote Operated Vehicles (ROVs), the anchors and mooring lines will be laid one after another for each unit. Due to water depths on site, all vessels will be Dynamically Positioned (DP Class) with no vessel anchor deployment required; • Following deployment, the pre-installed/tensioned mooring system and cable ends will be buoyed off temporarily, for later recovery and attachment to the WTG/substructure assembly following its arrival on site; • The full array cable length will likely be pre-laid, after the moorings, and left on site in so called “wet storage” ready for the “first-end pull in” operations;