Mobilisation Phase definition

Mobilisation Phase has the meaning given in Schedule 15 (Project Plan);

Examples of Mobilisation Phase in a sentence

  • The Contractor shall prepare the following reports and plans at the frequency, and by the dates, specified below and in such format agreed by the parties during the Mobilisation Phase.

  • Staffing levels for each month of the Mobilisation Phase and Maintenance Phase in the format set out in Part IX Annex I of Document A.

  • The Contractor shall enter into a Joint Education Forum partnering agreement with the Authority and the Other Contractors which shall set out the parties' agreement in relation to the content and aim of the Joint Education Forum and shall be developed by the parties during the Mobilisation Phase.

  • A sufficiently detailed proposal of how they intend to conduct the Mobilisation Phase in a detailed time phased plan which will include but not limited to organization chart and staff definition shown in Part IX Annex I & II of Document A, system of taking over, etc..

  • Project integrating processesAt the end of the SDP Mobilisation Phase, it was recognised that some critical areas of deployment for the project required special attention.

  • While the project was on time and delivered to budget there were nevertheless a myriad of technical and operational issues to be addressed during the Mobilisation Phase (just after ‘go-live’) which resulted in significant levels of customer frustration, a large backlog of customer contact to manage and widespread negative media attention.

  • The Mobilisation Phase from 1st July has ensured that all service users were safely transferred and their treatment continued, and Turning Point continues to receive new referrals.

  • Infrastructure Procurement and Mobilisation Phase Price is also specified in the Bid Data Sheet.

  • Tasks during Mobilisation Phase as set out in Scope of Work should be completed within the period specified in the Contract failing which the liquidated damages (“LDs”) at the rate of half of one percent per calendar week of delay or part thereof limited to seven and one half percent of the Total Price of Hardware Supply and Total Mobilisation and HW Commissioning Cost as per Table 2 and 2A of Section-4, Prices and Commercial Conditions shall be levied for the period for which the job is delayed.

  • Following award there will be an initial Mobilisation Phase of three (3) months due to the requirement for the Bus Operator to reach separate agreements with Hydrogen Provider and the Bus Manufacturer.

Related to Mobilisation Phase

  • Utilisation means a utilisation of the Facility.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Utilisation Date means the date of a Utilisation, being the date on which the relevant Loan is to be made.

  • stabilisation means processes which change the hazardousness of the constituents in the waste and transform hazardous waste into non-hazardous waste.

  • main phase employment and support allowance means an employment and support allowance where the calculation of the amount payable in respect of the applicant includes a component under section 2(1)(b) or 4(2)(b) of the Welfare Reform Act 2007 except in Part 1 of Schedule 1;

  • Utilisation Request means a notice substantially in the form set out in Part I of Schedule 3 (Requests).

  • Facility B means the term loan facility made available under this Agreement as described in paragraph (b) of Clause 2.1 (The Facilities).

  • First draw sample means a one−liter sample of tap water that has been standing in plumbing pipes at least 6 hours and is collected without flushing the tap.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;

  • Drawdown means the drawdown of a Tranche under the Loan Facility;

  • Facility A means the term loan facility made available under this Agreement as described in paragraph (a) of Clause 2.1 (The Facilities).

  • Single Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in a single homogeneous phase and which does not require that the product container be shaken before use.

  • Development Phase means the period before a vehicle type is type approved.

  • Facility Period means the period starting on the date of this Agreement and ending on such date as all obligations whatsoever of all of the Security Parties under or pursuant to the Security Documents whensoever arising, actual or contingent, have been irrevocably paid, performed and/or complied with;

  • Drawdown Period means, in relation to an Advance, the period commencing on the date of this Agreement and ending on the relevant Termination Date or the period ending on such earlier date (if any) on which (a) the aggregate amount of all Advances is equal to the Commitment or (b) the Commitment is reduced to zero pursuant to clauses 4.3, 10.2 or 12 or (c) Delivery of the Ship relevant to such Advance occurs;

  • Mobilization means establishment of sufficiently adequate infrastructure by the CONTRACTOR at "SITE" comprising of construction equipments, aids, tools tackles including setting of site offices with facilities such as power, water, communication etc. establishing manpower organisation comprising of Resident Engineers, Supervising personnel and an adequate strength of skilled, semi-skilled and un-skilled workers, who with the so established infrastructure shall be in a position to commence execution of work at site(s), in accordance with the agreed Time Schedule of Completion of Work. "MOBILISATION" shall be considered to have been achieved, if the CONTRACTOR is able to establish infrastructure as per Time Schedule, where so warranted in accordance with agreed schedule of work implementation to the satisfaction of ENGINEER-IN-CHARGE/ EMPLOYER.

  • Double Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in two or more distinct phases that requires the product container be shaken before use to mix the phases, producing an emulsion.

  • Facility C means the term loan facility made available under this Agreement as described in paragraph (c) of Clause 2.1 (Facilities).

  • Notice to Proceed (NTP) means the authorization issued by the CO to start performance on this Contract.

  • Rate Option means the Eurodollar Rate or the Floating Rate.

  • Facility B Loan means a loan made or to be made under Facility B or the principal amount outstanding for the time being of that loan.

  • Facility A Loan means a loan made or to be made under Facility A or the principal amount outstanding for the time being of that loan.

  • Work crew means a program of partial confinement

  • Lateral Access Roads has the meaning given in subclause (3)(a)(iv));

  • Fixed wing turbine powered aircraft means an aircraft that: