Minimum Output definition

Minimum Output means, for the particular Billing Year, the minimum amount of Output (in kWh) as set forth on Schedule 6 (Annual Contract Quantity).
Minimum Output the meaning attributed to it in Grid Code BC 2.A.3.1;
Minimum Output. The minimum net electrical power level at which a Unit can be reliably maintained in service on a continuous basis as established by the Operating Agent with the approval of the Plant Representatives.

Examples of Minimum Output in a sentence

  • The Leading and Lagging Reactive Power capability values obtained for Minimum Output and Full Output levels respectively must be at the same ambient temperature consistent with the data submitted in accordance with Schedule 1 of the Grid Code DRC.

  • We discuss them separately below: Minimum Output Power The minimum output power requirement for the IAB-MT is still under discussion (also if it will be defined or not).

  • ASRP 8.2.3 12-Hour Minimum Output CapabilityEach Black Start Generating Unit must be capable of sustaining its output for a minimum period of 12 hours from the time when it first starts delivering Energy.

  • The values for Full Output and Minimum Output should describe the normal operating (MW) range of a BM Unit.

  • If such obstruction is installed by Purchaser and no emergency exists, and such obstruction has the effect of decreasing the Output of the System below the Minimum Output for the relevant Billing Year (as pro rated for a Billing Month basis) for a period of two (2) Billing Months or longer, the Parties shall promptly meet and discuss options for removal of said obstruction, if capable of removal.

  • Each Generator shall be set to Minimum Output of 250KW (33% of the generator capacity) and the maximum normal output of 750K W (100% of generator capacity).

  • Minimum Output The MW output of a Generating Unit measured at the generator stator terminals representing the LV equivalent of the Minimum Generation at the Grid Entry Point.

  • The values referred to in sub-Section 2.10 above constitute the Reactive Power capability of a Generating Unit at Full Output, at Rated MW and at Minimum Output at the generator stator terminals equivalent to the minimum Reactive Power capability required under and in accordance with the Connection Conditions of the Grid Code.

  • The Minimum Output shall be verified by Party B, which verification shall occur within 45 business days after the end of the Output Period.

  • The Generating Unit is operating outside its normal operational envelope of registered characteristics (i.e. operating above Full Output, or below the Minimum Output).

Related to Minimum Output

  • Minimum Payment means the amount of minimum payment as stated in the Fee Schedule;