Meter Location definition

Meter Location means the physical location where Energy is measured by the revenue class meter referred to in Section 6.2 and in Schedule 5.
Meter Location means the location (in the format of longitude/latitude) of a meter record. It will be pre-defined in the meter table with at least 3 digits after the decimal point. Each meter must have a meter location.
Meter Location means the state, New York or Pennsylvania, in which an individual meter on Exhibit A is geographically located.

Examples of Meter Location in a sentence

  • These values are the same as for the Meter Location and in the short term can be set to be the same, however the location of the meter point can be different than the Meter and the MEM requires both e.g. for inspects, they need to check the meter and the connection point.

  • Along with initial submission of Construction Documents, Developer shall furnish copies of the Service and Meter Location Request and all utility companies’ verifications.

  • Along with initial submission of Construction Documents, Developer shall furnish copies of the Service and Meter Location Request and all utility companies verifications.

  • The scope of work will generally be as follows:  ▇▇▇▇▇ & Creed will develop a Preliminary Flow Meter Location Map in an effort to determine where the proposed open channel flow meters will be placed (estimated to be 4 locations, two in each subbasin).

  • The Energy delivered to the Utility at the Delivery Point will be determined by adjusting for Energy losses between the Meter Location and the Delivery Point.

  • MDP Detail By Meter: Location Meter MDP(PSIG) Conexus Energy, LLC Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇, ▇▇▇▇▇ ▇▇▇ Tulsa, OK 74119 RE: Negotiated Rate Agreement Dear ▇▇▇▇▇ ▇▇▇▇▇▇▇: Southern Star Central Gas Pipeline, Inc.

  • Along with initial submission of Plans and Specifications, CSU will furnish copies of the Service and Meter Location Request and all utility companies’ verifications.

  • Along with initial submission of Construction Documents, Subdivider shall furnish copies of the Service and Meter Location Request and all utility companies verifications.

  • If a Pennsylvania-American interceptor overflows or floods beyond its design capacity, as indicated by the level monitoring system, and causes a Meter Location to have false readings, the data collected from that meter shall be considered void and the average flow from remaining data shall be substituted in its place for the Sewer Use Charge and Exceedance Penalty (defined below) calculations.


More Definitions of Meter Location

Meter Location means the physical location of the meter measuring the amount of natural gas supplied to the customer. Meter locations in all instances will be determined by the City and will be located so as to be accessible to the City’s meter readers at all times.
Meter Location means the physical location where Energy is measured by the revenue class meter referred to in Section 6.2(a). Net Output - means the Energy output of the Generating Facility at the Delivery Point, as determined in accordance with Section 6.2. Party - means either the Seller or the Utility and Parties refers to both the Seller and the Utility. Permits - means permits, certificates, licences and other approvals required for the ownership, design, construction, operation, maintenance, rehabilitation or modification of the Generating Facility and interconnection facilities and, if applicable, the delivery of Energy to the Delivery Point. Person - includes a natural person, a corporation, a partnership, a limited partnership, a joint venture, an association, a trust, a government agency and an unincorporated organization. Prime Rate - means the annual rate of interest established by the Bank of Nova Scotia or its successor, from time to time, as the interest rate it will charge for demand loans in Canadian Dollars to its commercial customers in Canada and which it designates as its "prime rate" based on a year of 365 or 366 days, as applicable. Any change in such interest rate shall be effective automatically on the date such change is announced by the Bank of Nova Scotia. Such rate of interest shall be calculated (but not compounded) daily, and compounded monthly, both before and after default, arbitral award and judgement. Project - means the Generating Facility and any rights, property and assets, whether real or personal and whether tangible or intangible, required to design, construct, operate, maintain, rehabilitate or modify the Generating Facility, or required for use ofthe Site, including any contract or engagement for such purpose, Permits, roads, and any land tenure and land tenure agreements. Project Amendment - means any material modification, variation, or amendment of the Project Description or the Commercial Terms.
Meter Location means the physical location of the electric meter measuring the amount of power and energy supplied to the applicant. Meter locations in all instances will be determined by the Association and will be located so as to be accessible to the Association's service personnel at all times.