Mechanical Floor definition

Mechanical Floor means a Floor which, by reason of the size and/or number of vertical penetrations (other than elevator machine rooms and elevator shafts) thereon, has a Rentable Area which is materially less than a typical Floor.

Examples of Mechanical Floor in a sentence

  • Notwithstanding the foregoing, Tenant in its sole discretion may elect to have any or all of the Excess Space located on Floor Two (2) or Three (3) or on any Mechanical Floor.

  • Notwithstanding the foregoing requirements, no Additional Initial Premises shall be located on any Mechanical Floor unless Tenant shall otherwise elect in its sole discretion.

  • In exchange for the surrender for IFG of its right to the Mechanical Floor Lease, BDC agrees to lease up to 2,500 square feet of rentable area on a Mechanical Floor to IFG, at IFG’s option, for storage purposes.

  • Mechanical Floor air handlers in place and operational; Main air distribution ducts in place to and including VAV boxes in accordance with building standard (i.e.12 on each floor, with 2 of the 12 located in the Common Areas).

  • The perimeter fan power VAV terminals will also serve a portion of the skin cooling load and will be provided and installed under core and shell work as indicated on Base Building Mechanical Floor Plans MP-3 and MP-4 drawings, dated 3/27/00.

  • Any such lease shall be in the form of the then standard lease for a Mechanical Floor, with such changes thereto as the parties may agree, both acting reasonably and in good faith.

  • Building heating will be accomplished by a "skin system" consisting of series-flow fan powered VAV terminals (8 per typical floor) with electric resistance heating coils as indicated on Base Building Mechanical Floor Plans MP-3 and MP-4 drawings, dated 3/27/00.

  • The entire HVAC system will be installed as part of the core and shell work as indicated on Base Building Mechanical Floor Plans MP-3 and MP-4 drawings, dated 3/27/00, with the exception of the cooling only VAV terminals and cooling only discharge ductwork and supply and return outlets.

  • E-1 M-1 M-2 M-3 M-4 M-5 Electrical Floor Plans Mechanical Cover Sheet Mechanical Floor Plans and Isometrics Mechanical Details Mechanical Schedules and Specifications Mechanical Floor Plans and Isometrics 7/26/21 7/26/21 7/26/21 7/26/21 7/26/21 7/26/21 See plans sheet M-4 Portions of Addenda relating to bidding or proposal requirements are not part of the Contract Documents unless the bidding or proposal requirements are also enumerated in this Article 9.

  • Mechanical Floor air handlers in place and operational; Main air distribution ducts in place to and including VAV boxes in accordance with building standard (i.e. 12 on each floor, with 2 of the 12 located in the Common Areas).