Lead Time means the quoted timeframe calculated between the date of receipt of the PO by Supplier and the Delivery Date.
Maximum Run Time means the maximum number of hours a generating unit can run over the course of an Operating Day, as measured by PJM’s State Estimator.
Minimum Order Quantity means the minimum number of batches of a Product to be produced during the same cycle of manufacturing as set forth in a Product Agreement on Schedule B;
Total maximum daily load or "TMDL" means the sum of the individual wasteload allocations for point sources, load allocations (LAs) for nonpoint sources, natural background loading and a margin of safety. TMDLs can be expressed in terms of either mass per time, toxicity, or other appropriate measure. The TMDL process provides for point versus nonpoint source trade-offs.
Maximum Limit means that number of issued Shares representing 10% of the total number of issued Shares as at the date of the passing of this Resolution (excluding any Shares which are held as treasury shares as at that date); and