Maximum Facility Output definition

Maximum Facility Output means the maximum (not nominal) net electrical power output in megawatts, specified in the Interconnection Service Agreement, after supply of any parasitic or host facility loads, that a Generation Interconnection Customer’s Customer Facility is expected to produce, provided that the specified Maximum Facility Output shall not exceed the output of the proposed Customer Facility that Transmission Provider utilized in the System Impact Study. Maximum State of Charge:
Maximum Facility Output means the maximum (not nominal) net electrical power output in megawatts, specified in the Interconnection Service Agreement, after supply of any parasitic or host facility loads, that a Generation Interconnection Customer’s Customer Facility is expected to produce, provided that the specified Maximum Facility Output shall not exceed the output of the proposed Customer Facility that Transmission Provider utilized in the System Impact Study.
Maximum Facility Output means the maximum (not nominal) net electrical power output in megawatts, specified in the Interconnection Service Agreement, after supply of any parasitic

Examples of Maximum Facility Output in a sentence

  • PJM reserves the right to limit total injections to the Maximum Facility Output in the event reliability would be affected by output greater than such quantity.

  • An Interconnection Customer entering the New Services Queue on or after October 1, 2012 with a proposed new Customer Facility that has a Maximum Facility Output equal to or greater than 100 MW shall install and maintain, at its expense, phasor measurement units (PMUs).

  • Interconnection Service shall be provided to the Interconnection Customer at the Point of Interconnection (a), in the case of interconnection of the Customer Facility of a Generation Interconnection Customer, up to the Maximum Facility Output, and (b), in the case of interconnection of the Customer Facility of a Transmission Interconnection Customer, up to the Nominal Rated Capability.

  • The Water Strider ISA facilitates the interconnection to the Transmission System of 80 MW (Maximum Facility Output) at the Stagecoach Solar Customer Facility located Near Jenny’s Xxxx Trail and Stage Coach Road, Nathalie, Virginia.

  • Size in megawatts of Customer Facility: For Generation Interconnection Customer:Maximum Facility Output of 215.4 MW as follows: Queue No.MFO (MW) The stated size of the generating unit includes an increase in the Maximum Facility Output of the generating unit of 105.9 MW over Interconnection Customer’s previous interconnection.

  • On or before December 7, 2027, Interconnection Customer must demonstrate commercial operation of an incremental increase over Interconnection Customer’s previous interconnection, as set forth in Specifications, section 1.0(c) of this Interconnection Service Agreement for increases in Maximum Facility Output and in Specifications, section 2.1 of this Interconnection Service Agreement for increases in Capacity Interconnection Rights.


More Definitions of Maximum Facility Output

Maximum Facility Output means the maximum net electrical power output in megawatts, specified in the Interconnection Service Agreement, after supply of any parasitic or host facility loads, that the Customer Facility is expected to produce.
Maximum Facility Output means the maximum (not nominal) net electrical power output
Maximum Facility Output or “MFO”) at the Egypt Road Solar Customer Facility located in Cambridge, MD. See Egypt Road ISA, Specifications, section 1.0. The Egypt Road ISA specifies that Egypt Road shall have 24.8 MW of Capacity Interconnection Rights (“CIRs”) at the Point of Interconnection specified in the Egypt Road ISA. See Egypt Road ISA, Specifications, section 2.1. The Egypt Road ISA has no Attachment Facilities Charge, but Network Upgrades Charges in the amount of $2,349,672, which consists of $1,743,814 in direct labor costs, $845,882 in direct material costs, $140,980 in indirect labor costs, and $93,987 in indirect material costs. See Egypt Road ISA, Specifications, sections 4.1 through 4.5.

Related to Maximum Facility Output

  • Facility Amount means (a) prior to the end of the Revolving Period, $250,000,000, unless this amount is permanently reduced pursuant to Section 2.5 or increased pursuant to Section 2.8, in which event it means such lower or higher amount and (b) from and after the end of the Revolving Period, the Advances Outstanding.