Materially Conforms definition

Materially Conforms means that the deliverable is ready to be used in production and meets or exceeds its intended functionality and performance. If the deliverable Materially Conforms to the specifications, then PGCC will provide written confirmation to Contractor that the deliverable is accepted.

Examples of Materially Conforms in a sentence

  • As used herein, the term "Materially Conforms" means that the deliverable is ready to be used in production and meets or exceeds its intended functionality and performance.

  • Within the time period specified in the Contract including any Contract Amendments, or if not specified, then within thirty (30) business days of receipt by HCPSS of a scheduled deliverable from Contractor, HCPSS shall determine whether such deliverable Materially Conforms to the specifications defined in the Contract.

  • If the deliverable Materially Conforms to the specifications, then HCPSS will provide written confirmation Contractor that the deliverable is accepted.

  • If the deliverable Materially Conforms to the specifications, then HCPSS will provide written confirmation to Contractor that the deliverable is accepted.

  • If the deliverable Materially Conforms to the specifications, then UMUC will provide written confirmation to Contractor that the deliverable is accepted.

  • If the deliverable Materially Conforms to the specifications, then UMGC will provide written confirmation to Contractor that the deliverable is accepted.

  • Within the time period specified in the Contract including any Contract Amendments, or if not specified, then within thirty (30) business days of receipt by UMUC of a scheduled deliverable from Contractor, UMUC shall determine whether such deliverable Materially Conforms to the specifications defined in the Contract.

  • Within the time period specified in the Contract including any Contract Amendments, or if not specified, then within thirty (30) business days of receipt by UMGC of a scheduled deliverable from Contractor, UMGC shall determine whether such deliverable Materially Conforms to the specifications defined in the Contract.

  • Within the time period specified in the Contract including any Contract Amendments, or if not specified, then within five (5) business days of receipt by PGCC of a scheduled deliverable from Contractor, PGCC shall determine whether such deliverable Materially Conforms to the specifications defined in the Contract.

  • If the deliverable Materially Conforms to the specifications, then PGCC will provide written confirmation to Contractor that the deliverable is accepted.

Related to Materially Conforms

  • Medically confirmed means the medical opinion of the attending physician has been confirmed by a consulting physician who has examined the patient and the patient's relevant medical records.

  • Substantially Complete or “Substantial Completion” shall mean that (a) the Base Building Improvements that are required to permit Tenant to enter the Premises for purposes of performing the Tenant Improvement have been completed in accordance with the Building Plans, the correction or completion of which items, collectively, will not substantially interfere with Tenant’s ability to commence the Tenant Improvement Work and (b) Tenant is legally permitted to enter the Premises for purposes of performing the Tenant Improvement Work. Landlord and Tenant shall then arrange a mutually convenient time, no later than ten (10) Business Days after the anticipated Substantial Completion Date specified in Landlord’s notice, for Tenant and/or Tenant’s Architect (as defined below) and Landlord and/or Landlord’s Architect to conduct a walk-through inspection of the Base Building Improvements. During the inspection, Landlord’s Architect shall compile a punchlist of items yet to be completed. If Tenant or Tenant’s Architect shall fail to inspect the Base Building Improvements within ten (10) Business Days after the Substantial Completion Date specified in Landlord’s notice, the Base Building Improvements shall be deemed completed and satisfactory in all respects, and the Substantial Completion Date shall be the date set forth in Landlord’s notice. Landlord shall use commercially reasonable efforts to cause the remaining Base Building Improvements to have been completed on or before the Term Commencement Date in accordance with the Building Plans, the correction or completion of which items, collectively, will not substantially interfere with Tenant’s ability to occupy the Premises to commence the Tenant Improvement Work

  • Substantially Completed or "SUBSTANTIAL COMPLETION" or "SUBSTANTIALLY COMPLETE" means that the applicable portion of the Premises is broom clean, free of construction tools and materials, and Landlord's Original Work has been completed according to the Approved Original Base Building Plans and the Approved Original Leasehold Improvements Plans or Landlord's Expansion Work has been completed according to the Approved Expansion Base Building Plans and the Approved Expansion Leasehold Improvements Plans, as the case may be, with only minor punch list items that will not interfere to more than a minor extent with Tenant's use and enjoyment of the Premises remaining to be completed or corrected pursuant to the terms of this Lease; that an unconditional certificate of occupancy for the applicable portion of the Premises has been issued (unless the issuance thereof is conditioned upon any work or installations the responsibility of which is not included within Landlord's Original Work or Landlord's Expansion Work, as the case may be) and not suspended or revoked or amended in a manner that would prevent Tenant from occupying the applicable portion of the Premises for the purposes for which they were designed; and that all utilities called for in the Approved Original Base Building Plans or Approved Expansion Base Building Plans, as the case may be, or the Approved Original Leasehold Improvements Plans or the Approved Expansion Leasehold Improvements Plans, as the case may be, are installed and operable with all hook-up, tap or similar fees paid.

  • Specially constructed vehicle means any vehicle that was not originally constructed under a

  • Environmentally constrained area means the following areas where the physical alteration of the land is in some way restricted, either through regulation, easement, deed restriction or ownership such as: wetlands, floodplains, threatened and endangered species sites or designated habitats, and parks and preserves. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program.

  • Contract Specifications means the principal trading terms in CFD (for example Spread, Swaps, Lot Size, Initial Margin, Necessary Margin, Hedged Margin, the minimum level for placing Stop Loss, Take Profit and Limit Orders, financing charges, charges etc) for each type of CFD as determined by the Company from time to time.

  • Product Specifications means those Manufacturing, performance, quality - control release, and Fill/Finish specifications for Drug Substance or Licensed Product in the Territory, which are initially as set forth in the applicable Regulatory Approval for a Licensed Product, as such specifications may be amended from time to time pursuant to the terms of this Agreement.

  • Construction Start Date means the later to occur of the date on which Seller delivers to Buyer (a) a copy of the Notice to Proceed that Seller has delivered to the EPC Contractor for the Project, and (b) a written Certification substantially in the form attached hereto as Appendix IV-1.

  • Plans and Specifications means the plans, drawings and specifications reasonably necessary to properly assess and review proposed Work prior to issuance of any approval that may be required under this Agreement;

  • Product Specification means a product specification for a Medical Device set out in Schedule 2;

  • Congenital Condition(s) means (a) any medical, physical or mental abnormalities existed at the time of or before birth, whether or not being manifested, diagnosed or known at birth; or (b) any neo-natal abnormalities developed within six (6) months of birth.

  • Functional Specifications means the descriptions of features and functions of the Application as expressly set forth in Quote.

  • TENDER SPECIFICATIONS means the Scope of Work, Special Instructions / Conditions, Technical specifications/requirement , Appendices, Site Information and drawings pertaining to the work and any other relevant reference in the Tender Document for which the Bidder are required to submit their offer.

  • Environmentally critical area means an area or feature which is of significant environmental value, including but not limited to: stream corridors, natural heritage priority sites, habitats of endangered or threatened species, large areas of contiguous open space or upland forest, steep slopes, and well head protection and groundwater recharge areas. Habitats of endangered or threatened species are identified using the Department’s Landscape Project as approved by the Department’s Endangered and Nongame Species Program.

  • Product Specific Terms means the terms applicable to a specific item of Licensed Software as set out in Schedule 2;

  • Standard Specifications means a compilation in book form of specifica- tions approved for general application and repetitive use;

  • TENDER SPECIFICATION means “Specific conditions, technical specifications, appendices, site information and drawing pertaining to the work in which the tenderers are required to submit their offer. Individual specification number will be assigned to each tender specification.

  • SOFR Adjustment Conforming Changes means, with respect to any SOFR Rate, any technical, administrative or operational changes (including changes to the interest period, timing and frequency of determining rates and making payments of interest, rounding of amounts or tenors, and other administrative matters) that the Administrator decides, from time to time, may be appropriate to adjust such SOFR Rate in a manner substantially consistent with or conforming to market practice (or, if the Administrator decides that adoption of any portion of such market practice is not administratively feasible or if the Administrator determines that no market practice exists, in such other manner as the Administrator determines is reasonably necessary).

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Construction sign means a sign which identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.

  • Delivery Schedule means the schedule for the delivery of Services as set forth in attached Annex 3.

  • Applicable Technical Requirements and Standards means those certain technical requirements and standards applicable to interconnections of generation and/or transmission facilities with the facilities of an Interconnected Transmission Owner or, as the case may be and to the extent applicable, of an Electric Distributor, as published by Transmission Provider in a PJM Manual provided, however, that, with respect to any generation facilities with maximum generating capacity of 2 MW or less (synchronous) or 5 MW or less (inverter-based) for which the Interconnection Customer executes a Construction Service Agreement or Interconnection Service Agreement on or after March 19, 2005, “Applicable Technical Requirements and Standards” shall refer to the “PJM Small Generator Interconnection Applicable Technical Requirements and Standards.” All Applicable Technical Requirements and Standards shall be publicly available through postings on Transmission Provider’s internet website.

  • Building materials means such commodities or articles as are specified by the Administrator by notification to be building materials for the purposes of this Act;

  • IS Specification means the Specification of latest edition with amendments, if any, up to time of receipt of tender by Corporation issued by the Bureau of Indian Standards as referred to in the specifications and / or work orders.

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.