Manual Test definition

Manual Test means using hand-held instruments, immediate control-system readouts or direct observation to verify performance (contrasted to analyzing monitored data taken over time to make the “observation”).
Manual Test means a version of the Test which is performed using handheld pipettors, with technologist intervention to move the samples through the steps of the testing protocol.

Examples of Manual Test in a sentence

  • Intrusion panel events including but not limited to: Access Denied, Automatic Test, Comm Fail, Comm Restore, Faults, Faults Restore, Line Restore, Line Trouble, Manual Test, Pager Restore, Pager Trouble, AC Restore, AC Trouble, Alarm, Battery Low, Battery Low Restore, Disarm, Normal, Recent Close, Reset, Panic Alarm, Power Up, Program begin, Program Changed, Program End, System Shutdown, System Shutdown Restore, Tamper Alarm, Tamper Restore, Test End, Test Start, Time/Date changed.

  • Manual Test: Using hand-held instruments, immediate control system readouts or direct observation to verify performance (contrasted to analyzing monitored data taken over time to make the “observation”).

  • Manual Test - using hand-held instruments, immediate control system readouts or direct observation to verify performance (contrasted to analyzing monitored data taken over time to make the “observation”).

  • Manual Test - using hand-held instruments, immediate control system readouts or direct observation to verify performance (contrasted to analyzing monitored data taken over time to make the "observation").

  • Nearly one in five people living in the Middle East & North Africa (MENA) region is between the ages of 15-24 the age group defined as “youth”2 - the current number of youth in the region is unprecedented: nearly 82 million for adolescents (10-15 years old) in 20123.

  • Completion of the Power to Arrest Training Manual Test with 100% score in accordance with the Manual’s Administering Instructions.

  • No water leakage to the interior side of the window shall be present when tested according to the Metal Curtain Wall Manual Test C1.

  • Completion of the Power to Arrest Training Manual Test with 100% score in accordance with the Manual's Administering Instructions.

  • User Manual, Admin Manual, Test Cases, Test Plan and QA Results for User Acceptance testing.

  • Additional information about tests, assurances, and competencies • DSPs who come to your agency from another agency and have documentation of having completed training and passed the 2016 Orientation Manual Test there do not have to be retrained, although you should still discuss the values and concepts as they pertain to your agency’s policies with your new employee.

Related to Manual Test

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • PRINCIPAL TEST The CONTRACTOR rather than COUNTY has the right to control the manner and means of accomplishing the result contracted for.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Percolation test means a subsurface soil test at the depth of a proposed absorption system or similar component of an OWTS to determine the water absorption capability of the soil, the results of which are normally expressed as the rate at which one inch of water is absorbed. The rate is expressed in minutes per inch.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Witness Test means the Company’s right to witness the commissioning testing and/or Company-required Interconnecting Customer-owned communication system. Commissioning testing is defined in IEEE Standard 1547-2003.

  • Genetic test means an analysis of human DNA, RNA, chromosomes, proteins, or metabolites, that detect genotypes, mutations, or chromosomal changes. The term “genetic test” does not mean an analysis of proteins or metabolites that does not detect genotypes, mutations, or chromosomal changes; or an analysis of proteins or metabolites that is directly related to a manifested disease, disorder, or pathological condition that could reasonably be detected by a health care professional with appropriate training and expertise in the field of medicine involved.

  • Incurrence Test means the incurrence test set out in Clause 12.1 (Incurrence Test).

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Nominal Rated Capability means the nominal maximum rated capability in megawatts of a Transmission Interconnection Customer’s Customer Facility or the nominal increase in transmission capability in megawatts of the Transmission System resulting from the interconnection or addition of a Transmission Interconnection Customer’s Customer Facility, as determined in accordance with pertinent Applicable Standards and specified in the Interconnection Service Agreement.

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • TENDER SPECIFICATION means “Specific conditions, technical specifications, appendices, site information and drawing pertaining to the work in which the tenderers are required to submit their offer. Individual specification number will be assigned to each tender specification.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Instantaneous flow measurement means the flow measured during the minimum time required for the flow-measuring device or method to produce a result in that instance. To the extent practical, instantaneous flow measurements coincide with the collection of any grab samples required for the same sampling period so that together the samples and flow are representative of the discharge during that sampling period.