LTSM definition
Examples of LTSM in a sentence
Pond 4 LCRS and LDS action levels, approved by EPA and UDEQ, were formally developed in the Repository and Pond 4 Groundwater Contingency Plan-Final (DOE 1998) and are also found in Appendix D, Section 5.0 of the LTS&M Plan.
LM has followed and will continue to follow normal LTS&M protocol to provide radiological control in the affected roadways.
The LCRS recirculation system is operating as intended and the action level leakage rate, as described in Section 3.4 of the LTS&M Plan, has not been exceeded.
All LTSM orders will be placed with the publishers by July of every year Key to the improvement of teaching and learning is the upgrading of 12 127 educators in order to meet the REQV 14 requirement by 2014 Teachers should be present at school teaching for at least seven hours and should arrive at school on time.
The LTS&M for the MVP consists of providing radiological control at excavations in Monticello roadway and utility corridors, in Utah Department of Transportation (UDOT) right-of-ways within the city limits, and at property MS-00176-VL (privately owned supplemental standards property).
Records and information for LTSM turnover or retention plans are reflected in post closure or disposition plans.
LTS&M activities for the MMTS consist of (1) maintaining the onsite repository and operating the associated LCRS and Leak Detection System (LDS) for the disposal cell and Pond 4 (the engineered solar evaporation pond), (2) surveillance of properties affected by groundwater-and land-use ICs on the former mill site and peripheral properties, and (3) operation and maintenance of the OU III groundwater remediation system.
The LTS&M for the MVP consists of providing radiological control at excavations in Monticello roadway and utility corridors, in Utah Department of Transportation (UDOT) rights-of-way within the city limits, and at property MS-00176-VL (privately owned supplemental standards property).
Note that one action among these follow-up actions resulted in a reissue of the Monticello site LTS&M Plan.
LTS&M for the MVP consists of providing radiological control at excavations in Monticello roadway and utility corridors, in Utah Department of Transportation (UDOT) rights-of-way within city limits, and at property MS-00176-VL (a privately owned supplemental standards property).