LOM AISC definition

LOM AISC means the life of mine all-in sustaining cost as defined in the Los Gatos Technical Report. It includes cash costs include all direct and indirect operating cash costs related to the physical activities of producing metals, including mining, processing and other plant costs, treatment and refining costs, freight and handling, general and administrative costs and royalties. All-in-sustaining cost or all-in-sustaining cost before by-product credits includes total production cash costs incurred at the LGJV’s mining operations plus sustaining capital expenditures and reclamation accretion expense and excludes Gatos Silver and Dowa corporate costs and allocations paid by the LGJV. All-in-sustaining after by-product credits includes the all-in-sustaining costs minus revenues from the sale of zinc, lead and gold (“by-product credits”).

Related to LOM AISC

  • Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.

  • Bathroom and tile cleaner means a product designed or labeled to clean tile or surfaces in bathrooms. “Bathroom and Tile Cleaner” does not include “Toilet/Urinal Care Product.”

  • LWDA means the California Labor and Workforce Development Agency, the agency entitled, under Labor Code section 2699, subd. (i).

  • Signaling System 7 (SS7) means a signaling protocol used by the CCS Network.

  • Single Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in a single homogeneous phase and which does not require that the product container be shaken before use.