Loading System definition

Loading System the ‘PoliStream’ automatic subtitle broadcasting system, or such other equivalent system as required by S4C from time to time during the Term; “Relevant Programmes” such programmes(s) that S4C selects from time to time during the Term as notified to the Company. “Subtitles to be Burnt” the subtitles files (in English or Welsh) selected by S4C to be ‘burnt in’ (BIST) to Relevant Programmes, which may be different to the original programme for which the subtitles were originally created (i.e. an ‘omnibus’ version of several original programmes); “Subtitles to be Loaded” the subtitles files for such of the Relevant Programmes to be loaded as notified to the Company by S4C; “Welsh Subtitles” Welsh language subtitles for the Relevant Programmes, being subtitles including a summary in the Welsh language of the dialogue and/or commentary and any other significant sounds occurring during the Relevant Programmes.

Examples of Loading System in a sentence

  • System Manual (CLS) The CLS details handling procedures for the Cargo Loading System.

  • Be responsible for repair and maintenance of the Aeromedical Systems including the Aeromedical Electrical System, the Aeromedical Oxygen System, the Aeromedical Suction System, the Aeromedical Communications Systems, the Cabin Fit-out, and the Stretcher Loading System, and must have access to the appropriate spares.

  • In addition to shore based terminals, the vessel will be able to take cargo from an offshore loading facility, i.e. either a ▇▇▇-System, OLS (previously UKOLS, (▇▇▇▇▇▇ Kongsberg Offshore Loading System)), a floating storage unit (FSU / FPSO), or conventional surface type, ALP, (Articulated Loading Platform) All installed equipment will be integrated in existing systems.

  • The Bow Loading System (BLS) will be installed on main deck forward as outlined on the general arrangement (hereinafter called as the G.A.).

  • This test is to demonstrate that the Condensate Loading System meets the Condensate flow and loading rate guarantee as shown in Project Specification Process Design Basis.

  • CHP, Railway Siding: MDO on behalf of HPGCL shall design, construct the Coal handling system, MRSS, Silo and Rapid Loading System (RLS), permanent Railway Siding near the block/ Temporary Railway Siding / improvements at Harinsingh Railway Siding and all the Documented Costs incurred by the MDO shall be reimbursed by the HPGCL in stages after due certification by Independent Engineer.

  • Feed Loading System “Dead Box” 12 months after the issuance of the CAO Truck Traffic Fugitive Dust Program Road Sweeper 4 months after issuance of the CAO In accordance with the CAO, beginning April 1, 2007, MGP shall limit VOC emissions from the facility to less than 95 tons per year.

  • System Manual (CLS) --------------------------------- The CLS details handling procedures for the Cargo Loading System.

  • INSTALLATION OF THE CARGO-LOADING SYSTEM The Seller has issued, upon the Buyer's request, RFC No. 25-6099 for the "Non-Installation of the Cargo Loading System".

  • CHP, Railway Siding: MDO on behalf of HPGCL shall design, construct the Coal handling system,MRSS, Silo and Rapid Loading System (RLS), permanent Railway Siding near the block/Temporary Railway Siding / improvements at Harinsingh Railway Sidingand all the Documented Costs incurred by the MDO shall be reimbursed by the HPGCL in stages after due certification by Independent Engineer.