Load Duration definition
Load Duration means the number of hours (including decimal values) during which the Heat-Producing PPP Facility operated on a specific Load Level I during the relevant period; Maximum Hourly Quantity means [***to be filled in on the basis of the winning bidder’s proposal to correspond to the maximum possible Heat Load Level as per Appendix 4 of the Schedule 4 of the PPP Contract***] MWh;
Examples of Load Duration in a sentence
Category Actual Load Duration ηdel (Btu/Hr) (Hr) (%) 1 15,000 10.2 70.0 2 26,000 8.4 75.5 3 50,000 6.4 80.1 4 100,000 4.7 80.9 Category 2 Duration is just above 8 hours, therefore: X1 = 26,000 Btu/hr, ηdel1 = 75.5% and Y1 = 8.4 Hrs.