Line 5 definition
Examples of Line 5 in a sentence
National Grid shall be responsible for and shall make improvements to the Elbridge Substation to receive and accommodate the Proposed Line, Relocated Line 15, and Bused Line 5.
Except with regard to improvements required at the Elbridge Substation or the construction of Bused Line 5, NYSEG will be responsible for obtaining any environmental permits or other authorizations necessary for the construction of the ATP facilities, including, without limitation, any permits required by the U.S. Army Corp of Engineers, and shall also be responsible for satisfying any mitigation requirements associated with any such permits and authorizations.
The Existing Facility interconnects to the Connecting Transmission Owner’s 34.5 ▇▇ ▇▇▇▇▇▇-Patroon Line #5 (“▇▇▇▇▇▇-Patroon Line #5”) via a single breaker tap arrangement.
For supplemental grants and changes to grants, the total amount of the increase or decrease as shown in Columns (1)-(4), Line 6k should be the same as the sum of the amounts in Section A, Columns (e) and (f) on Line 5.
For all applications for new grants and continuation grants the total amount in column (5), Line 6k, should be the same as the total amount shown in Section A, Column (g), Line 5.
The increase of generation added to the National Grid sub-transmission line will require relay settings modifications at the remote ends of the 34.5 ▇▇ ▇▇▇▇▇▇-Patroon Line #5 to which the interconnection is made.
The Total for 1st Year TOTAL in Section D must equal the Total (Row 5, Column G) in Section A Ensure that the Forecasted Cash Needs: 15 TOTAL equals to SECTION A – Budget Summary: Line 5.
SUBCLAUSE 54.1 – CONTRACTOR’S EQUIPMENT, TEMPORARY WORKS AND MATERIALS : Exclusive use for the works Amend Sub-Clause 54.1 as follows: Line 5: add “written” between “the” and “consent”.
The Point of Interconnection (“POI”) for the Existing Facility is the tap point (Connecting Transmission Owner’s Pole 17 ½) on the Connecting Transmission Owner’s 34.5 ▇▇ ▇▇▇▇▇▇-Patroon Line #5 (“Line #5), ▇▇▇ ▇▇▇ ▇▇▇▇▇▇▇▇ ▇ ▇▇▇▇ ▇▇.▇ kV Generator Lead Line.
Line 5 - Expected Number of Screenings - Calculated by multiplying Line 4 by Line 1.