Line 10 definition

Line 10. Commissioning limit, (7) plus (9), is the minimum performance to be demonstrated at the Provisional Acceptance.
Line 10. “RIR” shall mean the amount calculated pursuant to Section 5.3(b) of this Agreement; and Line 11: the “Positive Settlement Amount” and the “Negative Settlement Amount” shall mean the amounts calculated pursuant to Section 5.3(a) of this Agreement. Any amounts included in any of the items listed above shall be included in the calculation set out in this Schedule B only to the extent that such amounts have not been accounted for in any Monthly Report relating to any previous Accounting Period. Any amount specifically excluded from any line item shall be treated as though it were excluded from all other line items unless the context shall expressly require otherwise. No amount shall be included in more than one line item. In the event of any conflict between the application of any express provision in these notes or this Agreement, and the application of any statutory or regulatory rule under this Schedule, in each case for the purposes of determining the amount of any line item in this Schedule, the express provisions in these notes and this Agreement shall prevail. In calculating the Positive or Negative Settlement Amount (as the case may be) for the first Accounting Period:-

Examples of Line 10 in a sentence

  • The Interconnection Customer is responsible for obtaining the property/easements needed for the Line 10 Tap line, access roads to/from the Line 10 Tap, and work pads, in accordance with the standards set forth in Connecting Transmission Owner’s Standards and Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications, dated January 2019.

  • A 100’ wide ROW will be required for the construction, operation, and maintenance of the Line 10 Tap line and 125’ x 125’ work pads will be required for the installation of the new structures.

  • The Point of Interconnection (“POI”) for the Small Generating Facility is located on the Connecting Transmission Owner’s 115kV Maple Ave-Rotterdam Line 10 section of the Meco- Rotterdam Line 22/10 via a tap in the vicinity of tower 285.

  • The Point of Interconnection (“POI”) for the Small Generating Facility is located on the Connecting Transmission Owner’s 115kV Eastover Schaghticoke Line 10 between existing structures 348 and 349.

  • The Connecting Transmission Owner will engineer, design, construct, own and maintain the Line 10 Tap.

  • Line 10 - Participant Ratio - Pre-Calculated by dividing Line 9 by Line 8.

  • For the sake of contradiction, assume that both 0 and 1 are chosen in Line 10.

  • The existing line relays for Line 10 in panel 68 and reclosing relays on panel 16 will be removed, and the asbestos panels in control house 2 shall be replaced with sheet metal panels.

  • The existing Line 10 protection packages and breaker control relays at Rotterdam Substation cannot accommodate interconnection of the Small Generating Facility and shall be replaced.

  • The DSPs are equal to Part 3.3 DSP Input, Line 1 Contracted DSP Amount multiplied by the corresponding Number of DSPs on Part 3.3 DSP Input, Lines 5 through 9, plus an allocation of Line 10 Incurred But DSP Not Received.