Lifting definition
Examples of Lifting in a sentence
Buyers are required to pay Lifting charges/Loading charges, weighing charges and other expenses, if any, at the warehouse location directly at the time of lifting/delivery of stock.
Level of Lifting with respect to a Year shall be calculated in the form of percentage as per the following formula: Level of Lifting (LL) = (ACQ-DDQ) X 100 ACQ Where: LL = Level of Lifting of Coal by the Purchaser during the Year.
It is expressly clarified that no such revision in ACQ shall take place if the average Level of Lifting (LL), as per the foregoing, is greater than eighty percent (80%).
The notice may define the Lifting Period as daily, a 10-day period, monthly, or any other time period.
Lifting of water from the individual sump tank to the over head water tanks shall be the responsibility of the individual purchaser/resident, as stated above.
Lifting Hooks Lifting hook shall be of MS as per specification and drawing.
Level of Lifting with respect to a Year shall be calculated in the form of percentage as per the following formula: Level of Lifting (LL) = (ACQ-DDQ) X 100 Where: LL = Level of Lifting of Coal by the Purchaser during the Year.
The notice to Distributor will specify (i) an effective date, (ii) the time period over which liftings will be measured (the “Lifting Period”) during the term the notice is in effect, (iii) the maximum volume allowed to be lifted without a higher price during any Lifting Period (the “Lifting Period Maximum”), and (iv) the amount of the higher price, or the method by which the higher price will be determined, on all volume of Product lifted during the Lifting Period above the Lifting Period Maximum.
Examples of construction submittals required include but are not limited to: Contractors Safety Action Plan, Fire Prevention Plan, Proposed Project Schedule, Demolition, Shoring, Falsework and Lifting of Materials.
Submittals must also follow the requirements outlined in BNSF Review Comment Sheets, Use of Cranes & Lifting of Materials Submittal Schedule, BNSF Guidelines for Preparation of Bridge Demolition & Removal Plan and the BNSF-UPRR Guidelines for Temporary Shoring.