Leveraged Resources definition

Leveraged Resources means funds and other contributions leveraged from resources outside of this grant to support the respondent’s project plan, such as staff, time, services, products and other non-cash resources.

Examples of Leveraged Resources in a sentence

  • In-Kind values will need to be broken out to specific categories in the attachment (Leveraged Resources Attachment 5) found in the DOCUMENTS section of this application.

  • In-kind Leveraged Resources: These involve additional types of support provided to assist HOPWA beneficiaries such as volunteer services, materials, use of equipment and building space.

  • Table A: Leveraged Resources The table in this section collects the Source of Resources, name of the entity(ies) providing resources, the year resources awarded or provided, how the resources are used, and the amount of resources leveraged to support the BF AWP project or BF AWP project area revitalization.

  • The East African Community (EAC) is proposing to restrict the duty exemption on solar goods to those related to solar generation (with the risk of consequently affecting VAT exemption as part of a national interpretation), thus excluding solar accessories.

  • In the midst of the abrupt reality of a dramatically altered life came to this good sister a timely and tender reminder that indeed families can be together forever.

  • Leveraged Resources Allowable Leveraged Resources Local Boards may apply leveraged resources spent on training and supportive services toward meeting a portion of their minimum training expenditure requirement (an amount of up to 10 percent of their adult and dislocated worker formula fund allocation).

  • Please refer to the budget section (Section X) below for a discussion on reporting Training Leveraged Resources.

  • Leveraged Resources – Strategic Industry Partnerships must leverage additional resources for the implementation of the Workforce Training Plan.

  • Leveraged Resources Beneficiary farmers contributed 20 percent of the value of the biogas digesters, amounting to a sum of US$1.40 million.

  • All Applicants with leveraged funds must complete the Chart B: Leveraged Resources (Excel).

Related to Leveraged Resources

  • Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • Material support and resources means currency or monetary instruments or financial securities, financial services, lodging, training, expert advice or assistance, safehouses, false documentation or identification, communications equipment, facilities, weapons, lethal substances, explosives, personnel, transportation, and other physical assets, except medicine or religious materials.”

  • Batch Load Demand Resource means a Demand Resource that has a cyclical production process such that at most times during the process it is consuming energy, but at consistent regular intervals, ordinarily for periods of less than ten minutes, it reduces its consumption of energy for its production processes to minimal or zero megawatts.

  • economic resources means assets of every kind, whether tangible or intangible, movable or immovable, which are not funds, but may be used to obtain funds, goods or services;

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.

  • Limited Resource Price Decrement means, for the 2017/2018 Delivery Year, a difference between the clearing price for Limited Demand Resources and the clearing price for Extended Summer Demand Resources and Annual Resources, representing the cost to procure additional Extended Summer Demand Resources or Annual Resources out of merit order when the Limited Resource Constraint is binding. List of Approved Contractors:

  • Environmentally-Limited Resource means a resource which has a limit on its run hours imposed by a federal, state, or other governmental agency that will significantly limit its availability, on either a temporary or long-term basis. This includes a resource that is limited by a governmental authority to operating only during declared PJM capacity emergencies.

  • renewable energy sources means renewable sources such as small hydro, wind, solar including its integration with combined cycle, biomass, bio fuel cogeneration, urban or municipal waste and other such sources as approved by the MNRE;

  • Non-Administrator Skilled Nursing Facility means a Skilled Nursing Facility which does not have an agreement with the Claim Administrator or another Blue Cross and/or Blue Shield Plan but has been certified in accordance with guidelines established by Medicare.

  • Generating Facilities means Interconnection Customer’s device for the production and/or storage for later injection of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities. Generation Interconnection Customer:

  • Continuous parameter monitoring system or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this chapter, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, oxygen or carbon dioxide concentrations), and to record average operational parameter value on a continuous basis.

  • Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);