Level 2 EVSE Packages have a maximum incentive of $50,000 or the following per Port and per project cost caps.
The warranty services must include repair or replacement of DCFC and Level 2 EVSE and ancillary equipment as necessary to correct any defects or failures.
In addition to the following requirements regarding uptime, I further agree to take reasonable and necessary steps in preparation for compliance with forthcoming regulation on uptime (i.e., AB 2061) which shall impact any Level 2 EVSE installed after 1/1/2024.
During the period of installation and ongoing operation (an estimated 18 – 24 months for installation plus 5 years of ongoing operation, maintenance and repair following commissioning of all WCEH stations), Contractor shall provide complete maintenance and operation services for both DCFC and Level 2 EVSE charging equipment.
Power supplied by the electric utility for a site is not supplied at levels required for minimum function of the Level 2 EVSE.
Installation of DC Fast-Chargers, Level 2 EVSE and associated structures and site improvements at all Oregon WCEH existing and new locations.
Ensuring the electrical power service and supply needed to power all DCFC and all Level 2 EVSE charging equipment.
The Point-of-Sale and supporting network must use an open protocol to allow subscribers of other EV charging system networks to access the charging station, as specified in the Requirements section of Attachment A, Oregon West Coast Electric Highway Technical Specifications for DCFC and Level 2 EVSE and Requirements for Operation.
Physical damage to the Project Site for events such as vehicle collision with a Level 2 EVSE, theft of charging cables, damage to connectors from mishandling, and damage to screens.
Contractor shall install new, upgraded DCFC and Level 2 EVSE at each of the 44 current Oregon WCEH sites (or install new, updated DCFC and Level 2 EVSE charging capability at new sites in each community, at locations that meet host site selection criteria), ensuring continued networked EV charging capability in each of the 44 communities currently being served by WCEH charging stations.