Laying Area means the area within a radius of two (2) nautical miles from the Crossing Point(s) as well as any area where the Crossing Pipeline is installed closer to the Affected Pipeline than two (2) nautical miles.
Laying Area means the area defined by a corridor of 500 metres to each side of the Affected Cable, with a length of 500 metres from the Crossing Point(s) in both directions of the Affected Cable, and as shown in Appendix B.

Examples of Laying Area in a sentence

  • Whenever such work is proposed on the cable within the Laying Area, the Party intending to carry out the work shall give written notification to the other Party at the earliest possible date, if possible at least 30 Days before the work will take place.

  • Whenever the Affected Party is intending to perform work in the Laying Area a notice of at least [seven (7)] days shall be given to the Crossing Party in order for its representative to board the relevant ship or craft performing work in the Laying Area.

  • The Crossing Party shall consult with the Affected Party and provide the Affected Party with detailed information about the design of the pipeline crossing, anchor patterns, laying methods and procedures including but not limited to information of the Laying Area received from ROV investigation, at least [thirty (30)] days prior to the planned start of the Laying Operation.

  • The Crossing Party shall obtain all approvals from relevant authorities required for the installation of the Crossing Cable in the Laying Area and shall, if requested by the Affected Party, confirm in writing to the Affected Party that such approvals have been obtained prior to commencement of the Laying Operation.

  • Whenever the Crossing Party is intending to perform work in the Laying Area, a notice of at least [seven (7)] days shall be given to the Affected Party in order for its representative to board the relevant ship or craft performing work in the Laying Area.

  • In cases where urgent work has to be carried out within the Laying Area, shorter verbal notification followed immediately by written confirmation, may be given.

  • Whenever a Party is intending to perform work in the Laying Area a written notice of at least 7 Days shall be given to the other Party that itsRepresentative can witness the Installation Work on board of the relevant ship or craft performing work in the Laying Area.

  • The Crossing Party shall, prior to the installation of the Crossing Pipeline carry out a pre-Laying Operation survey of the Affected Pipeline and the seabed along the proposed route of the Crossing Pipeline within the Laying Area.

  • The Crossing Party shall obtain all approvals from relevant authorities required for the installation of the Crossing Pipeline in the Laying Area and shall, if requested by the Affected Party, confirm in writing to the Affected Party that such approvals have been obtained prior to commencement of the Laying Operation.

  • The Post Laying Documentation shall be submitted to the Affected Party for review and approval as soon as possible, but not later than [three (3)] months after the Crossing Pipeline has been laid and installed, or any repair work has been completed, in the Laying Area.