Examples of Land side in a sentence
Overall by this development everyone in the locality will be benefitted.Jetty Beggars: As the government and various agencies are working for the welfare of people, it is necessary to rehabilitate the permanently occupied Land side beggars by giving suitable livelihood opportunities in the waterways sector for a descent earning.
In the event of any delay in the payment of the advance / down payment, the Seller has the right to postpone the delivery of goods and/or per- formance of the service until they have received the confirmation of the advance / down payment from the Seller's bank.
Land side shift would probably be required however there is a railroad that runs adjacent to the levee toe.
Land side development will have to be of a scale and height that causes no harm to the Regency Square Conservation Area and will preserve the setting of the West Pier.
In this Project, GOF will work with a vast array of stakeholders from governments, intergovernmental and international organizations, industry, and academia in ABNJ policy analyses, multi- stakeholder dialogues and working meetings, sessions on ABNJ in the global oceans conferences and in different UN-related forums (UN working group on ABNJ, CBD, UNICPOLOS, etc.), internship programs and public education and outreach.
Land side interfaceScheduling could be classified as the sixth area of activity, while it affects all of the other five activities it mainly serves as coordination between the water side interface and the gate operations, which will be described shortly.Figure 3.1 Map Included with “Truckers Guide to GPA”Figure 3.2 Aerial Photo of the GPA Garden City Terminal 3.1.1 Water-side (Berth) Interface The berth is the quite simply the parking place on the dock for the container ship.
When a container arrives to the terminal, the system decides which allocation is the most appropiate depending on the assigned cargo ship, its destination port, its dimensions, its weight and, if it is available, the allocation into the bay of the ship.2.4 Land side interfaceThe goal of this system is to control the access to the terminal of the trucks, which carry or take away the containers.The information is introduced into the system using EDI messages.
Table 3 Operationalization period for air side facilities Asset Period Year Air side capacity Runway 1 Table 4 Operationalization period for land side facilities Asset Period Year Land side capacity Module 1 The analyzed scenarios expose El Dorado II airport as a project with considerable risks.
Land side revenue streams include terminal rents and gate leases, concessions, parking fees, and in the United States, Passenger Facility Charges.
Land side development of south eastern zone phase I: the areas adjacent to the eastern side of the existing land-side installations (hangar and operational building) at Leipzig/Halle airport are to be fully equipped with electricity and a water supply, waste water installations and rainwater drainage by 2010; works began in 2008.