K factor definition
Examples of K factor in a sentence
Daily Price to be the sum of the daily price differential relative to [REDACTED] for Hibernla, the [REDACTED] price, Valero’s actual [REDACTED] actual [REDACTED], and [REDACTED] costs, ISTHMUS ISTHMUS in Tank: Price to be based on the average daily price differential for Isthmus relative to [REDACTED] as published by [REDACTED] for the [REDACTED] unique days [REDACTED] the Closing date, which includes the applicable K factor.
The program will calculate a K factor based on the actual nozzle size.
Pendant satin chrome plated, recessed heads, adjustable canopies, minimum K factor to be 5.62, located at center of scored ceiling tile.
Sprinkler head K factor should be selected to optimize the hydraulics of the fire sprinkler system.
Plans must clearly show all pertinent aspects of the vertical geometry including Stopping Sight Distance (SSD), Passing Sight Distance (PSD), ▇▇▇▇▇ ▇ (▇ ▇), ▇▇▇▇▇ ▇ (▇▇), ▇▇▇▇▇▇ of Vertical Curve (L), K (factor), station and elevation of Point of Vertical curvature (PVC), Point of Vertical Tangency (PVT) and Point of Vertical Intersection (PVI).
The Typical Conditions button will show up the AISC recommended values for the effective length K factor when ideal conditions are approximated.
These employees shall receive satisfactory rating in K factor providing they are making acceptable progress toward the next level.
The K Factor function calculates the ideal nozzle diameter and corresponding K factor, as well as the expected sample volume and moisture content based on manual inputs.
Pendant satin chrome plated, recessed heads, adjustable canopies, minimum K factor to be 5.62, located at center of 2’ x 2’ section of scored ceiling tile.
DocuSign Envelope ID: 0EF7DD01-5DEF-492D-AF48-72F6373D49D2 DocuSign Envelope ID: 973D3771-56AD-4A37-8E90-25E408E93E1A ▪ A.M. and P.M. peak-hour directional distribution ▪ Traffic Counts on Arterials and Local Streets ▪ K factor • The Engineer shall visit the project corridor and make observations regarding traffic patterns, existing areas of congestion, existing developments in the corridor and geometric conditions.