Item Schedule definition
Examples of Item Schedule in a sentence
Unless the Bid Item Schedule contained in Part D specifies otherwise, unit prices for individual line items shall include all costs, including but not limited to, mobilization, maintenance of traffic, insurance, bonds, and overhead and profit.
The Contractor shall within seven (7) calendar days visit the site, if needed, and submit a written quotation to the County, based solely upon the unit prices contained in the Bid Item Schedule, Part D.
Unless the Bid Item Schedule contained in Part D specifies otherwise, unit prices for individual line items shall include all costs, including but not limited to, mobilization, maintenance of traffic, overhead and profit.
Additionally, items in the Component Item Schedule (CIS) for an "as-designed" or alternate design structure, as well as work performed under a design-build contract, will be included when applying the specified price adjustment requirements, provided the work to be performed includes incorporation of one or more of the applicable steel materials specified in the above Sections and addressed herein.
The Contractor shall within seven (7) calendar days visit the site, if needed, and submit a written quotation to the County, based solely upon the unit prices contained in the Bid Item Schedule.
The apparent low bidder is to include a component item for Alternate Design Costs in the Component Item Schedule when an alternate design is bid.
Unless the Bid Item Schedule specifies otherwise, unit prices and lump sums for individual line items shall include all costs, including but not limited to, mobilization, maintenance of traffic, insurance, bonds, overhead and profit.
If the "as-designed" bridge structure is bid, submit the "Component Item Schedule", included with the Proposal, as specified in Section 103.01(a).
If an alternate design bridge structure is bid, the apparent low bidder is required to submit a "Component Item Schedule for Alternate Design" as specified in Section 103.01(a).
The Construction Manager shall provide personnel and equipment or shall arrange for separate subcontracts to provide each of the following as a Direct Cost Item: Schedule the services of independent testing laboratories and provide the necessary testing of materials to ensure conformance to contract requirements.