ITE Trip Generation Manual definition

ITE Trip Generation Manual means that publication entitled "Trip Generation, 7th Edition” (2001) published by the Institute of Transportation Engineers.
ITE Trip Generation Manual means the manual prepared by the Institute of Transportation Engineers, latest edition, for the purpose of assigning numbers of vehicle trips associated with various land uses.
ITE Trip Generation Manual means and refer to the report entitled Trip Generation (7th ed. 2004 or most current edition) of the Institute of Transportation Engineers.

Examples of ITE Trip Generation Manual in a sentence

  • Additional references assist in aligning use classes with the Redmond Building Code, Institute of Transportation Engineers (ITE) Trip Generation Manual, and the City’s Business Licensing system.

  • Additional references assist in generally aligning use classes with the Redmond Building Code, Institute of Transportation Engineers (ITE) Trip Generation Manual, and the City’s Business Licensing system.

  • The addition of twenty-five (25) or more single family dwellings, or an intensification or change in land use that is estimated to increase traffic volume by 250 Average Daily Trips (ADT) or more, per the ITE Trip Generation Manual.

  • Proposed pass-by trips should be in accordance with the ITE Trip Generation Manual.

  • If, in the opinion of the County, these failures indicate that the equipment is potentially prone to continuing failures, the Respondent shall replace it at no cost to the County.

  • When data is not available for a proposed land use or a modification is proposed, the Applicant must conduct a local trip generation study following procedures prescribed in the ITE Trip Generation Manual and provide sufficient justification for the proposed generation rate.

  • This traffic count must be based on the latest version of the Institute of Transportation Engineers (ITE) Trip Generation Manual.

  • Trip calculations are determined from the difference from vacant property to the traffic generated by the proposed development using the average generation rate from the latest version of the ITE Trip Generation Manual.

  • The CBMPO purchased the ITE Trip Generation Manual for use in traffic studies and development reviews.

  • The peak hour of the project/individual land use(s) (as given in the ITE Trip Generation Manual) should be added to the corresponding AM/PM existing peak hour of the adjacent roadway traffic volumes to show the ‘worst case’ scenario.


More Definitions of ITE Trip Generation Manual

ITE Trip Generation Manual means and refer to the report entitled Trip Generation (7th ed. 2004 or most current

Related to ITE Trip Generation Manual

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.

  • Program Manual means the United States Department of Agriculture, Animal and Plant Health Inspection Service, Plant Protection and Quarantine, Gypsy Moth Program Manual, 1994 edition.

  • Coordinated licensure information system means an integrated process for collecting, storing, and sharing information on nurse licensure and enforcement activities related to nurse licensure laws that is administered by a nonprofit organization composed of and controlled by licensing boards.

  • Customer-generator means a user of a net metering system.

  • Valuation manual means the manual of valuation instructions adopted by the NAIC as specified in this section or as subsequently amended.

  • Carrier Access Billing System (“CABS”) is the system which is defined in a document prepared under the direction of the Billing Committee of the OBF. The CABS document is published by Telcordia in Volumes 1, 1A, 2, 3, 3A, 4 and 5 as Special Reports SR-OPT-001868, SR-OPT-0011869, SR-OPT-001871, SR-OPT- 001872, SR-OPT-001873, SR-OPT-001874, and SR-OPT-001875, respectively, and contains the recommended guidelines for the billing of access and other connectivity services. Sprint’s carrier access billing system is its Carrier Access Support System (CASS). CASS mirrors the requirements of CABS.

  • Diagnostic clinical procedures manual means a collection of written procedures that describes each method (and other instructions and precautions) by which the licensee performs diagnostic clinical procedures; where each diagnostic clinical procedure has been approved by the authorized user and includes the radiopharmaceutical, dosage, and route of administration.

  • Database Management System (DBMS) A system of manual procedures and computer programs used to create, store and update the data required to provide Selective Routing and/or Automatic Location Identification for 911 systems. Day: A calendar day unless otherwise specified. Dedicated Transport: UNE transmission path between one of CenturyLink’s Wire Centers or switches and another of CenturyLink’s Wire Centers or switches within the same LATA and State that are dedicated to a particular customer or carrier. Default: A Party’s violation of any material term or condition of the Agreement, or refusal or failure in any material respect to properly perform its obligations under this Agreement, including the failure to make any undisputed payment when due. A Party shall also be deemed in Default upon such Party’s insolvency or the initiation of bankruptcy or receivership proceedings by or against the Party or the failure to obtain or maintain any certification(s) or authorization(s) from the Commission which are necessary or appropriate for a Party to exchange traffic or order any service, facility or arrangement under this Agreement, or notice from the Party that it has ceased doing business in this State or receipt of publicly available information that signifies the Party is no longer doing business in this State.

  • Basic Comprehensive User Guide means the Ministry document titled Basic Comprehensive Certificates of Approval (Air) User Guide” dated April 2004 as amended.

  • Designated chemical dependency specialist means a person

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • Access Tandem Switch is a Switch used to connect End Office Switches to interexchange Carrier Switches. Qwest's Access Tandem Switches are also used to connect and switch traffic between and among Central Office Switches within the same LATA and may be used for the exchange of local traffic.

  • Subsystem means any subset of the System identified as such in the Contract that may be supplied, installed, tested, and commissioned individually before Commissioning of the entire System.

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.

  • Eligible customer-generator means a customer-generator whose net energy metering system for renewable resources, cogeneration, fuel cells, and microturbines meets all applicable safety and performance standards.

  • LOCKHEED XXXXXX Procurement Representative means a person authorized by LOCKHEED XXXXXX'x cognizant procurement organization to administer and/or execute this Contract.

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Single tomogram system means a CT x-ray system which obtains x-ray transmission data during a scan to produce a single tomogram.

  • Electronic Subcontracting Reporting System (eSRS) means the Governmentwide, electronic, web-based system for small business subcontracting program reporting. The eSRS is located at http://www.esrs.gov.

  • Module means specific portion of the Application Software designated as such in the Documentation made available to the Customer under the Notification Form.

  • Basic generation service provider or "provider" means a

  • New jobs training program or “program” means the project or projects established by a community college for the creation of jobs by providing education and training of workers for new jobs for new or expanding industry in the merged area served by the community college. The proceeds of the certificates, as authorized by the Act, shall be used only to fund program services related to training programs made necessary by the creation of new jobs.

  • Basic generation service or "BGS" means electric generation

  • User Manual means the user guide, Help Guide, documentation provided with the Software, updated agreements provided on the website of Quick Heal (xxx.xxxxxxxxx.xxx), explanatory or other materials as provided from time to time by Quick Heal.

  • Utilization review plan or "plan" means a written procedure for performing review.